Contractor · Electrical
Moriarty Electric Company
97 building permits since 2022 in Dover city, NH; Hampton town, NH and Strafford town, NH, across 3 counties — $740,111 in reported job value over 89 permits that state one.
- Building permits
- 97
- Reported job value
- $740.1K
- Active
- 2022–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Dover city, NH80
- Hampton town, NH7
- Strafford town, NH4
- Alfred town, ME3
- Kennebunkport town, ME2
- North Hampton town, NH1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 7 |
| 2023 | 21 |
| 2024 | 28 |
| 2025 | 22 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators63
- HVAC52
- Electrical50
- Gas40
- Plumbing36
- Heat pumps8
- Electric meters6
- Windows & doors5
- Pools & hot tubs5
- Additions3
Permit types
As the building departments classify them.
- Mechanical - Gas30
- Electrical Alternate Energy Source23
- Electrical Wiring20
- Mechanical10
- Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)4
- Electrical3
- GN2
- Minor Building - Alteration and/or Addition2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Electrical Wiring | Purchase and install 24KW Generac standby generator m/n 007261 (aluminum housing) and combination 200A automatic service rated transfer switch/40-circuit panel | Dover City | $16,500 |
| Oct 19, 2026 | Mechanical - Gas | Purchase and install 24KW Generac standby generator m/n 007261 (aluminum housing). Provide 2-PSI propane system from existing generator gas- high pressure, unde | Dover City | $1,500 |
| Oct 16, 2026 | Mechanical - Gas | . Gas pipe installation provided by MEC to include dedicated propane regulator and +/-15' of surface mounted 3/4" painted black iron along base of shed to gener | Dover City | $1,500 |
| Oct 15, 2026 | Electrical Wiring | Purchase and install 18KW Generac standby generator m/n 0072590 (aluminum housing) and 200A automatic non-service rated transfer switch with whole house surge s | Dover City | $13,500 |
| Jul 6, 2026 | Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation) | Provide labor and material to install Samsung heat pump (mini-split) system. Samsung comes with 12-year warranty. Includes mini-split installation and electrica | Dover City | $10,850 |
| Jul 1, 2026 | Electrical Wiring | Provide labor and material to install Samsung heat pump (mini-split) system. Samsung comes with 12-year warranty. Includes mini-split installation and electrica | Dover City | $10,850 |
| Jun 22, 2026 | Electrical Wiring | 125A Underground service to 125A weather rated pool panel in trench provided by others (+/-130') to supply all pool equipment including 220/50a feed for heat pu | Dover City | $15,000 |
| Jun 2, 2026 | Mechanical | — | Alfred Town | $12,428 |
Permit status
Where its permits stand, as the departments report them.
- Completed71
- Issued17
- Void4
- Approved3
- Active2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.