Contractor · General building
CHASE PLUMBING & WELL SERVICES
98 building permits since 2023 in Howard County, MD.
- Building permits
- 98
- Reported job value
- —
- Active
- 2023–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD98
Permits by year
By issue date (application date where there is none).
02550
42
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 6 |
| 2024 | 14 |
| 2025 | 36 |
| 2026 (YTD) | 42 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing98
- Remodels82
- Additions72
- Gas56
- Kitchens36
- Bathrooms33
- Water heaters9
- HVAC6
- Fire sprinklers4
- Electrical3
Permit types
As the building departments classify them.
- Residential Plumbing Addition Alteration Permit69
- Express Plumbing Permit28
- Commercial Plumbing Addition Alteration Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | Express Plumbing Permit | Install new 1/2" CSST 2 PSI propane gas supply line from relocated exterior tank location through basement to existing 1" black steel gas main. Install 3/4" Max | Howard County | — |
| Sep 29, 2026 | Express Plumbing Permit | Install new gas line from existing basement gas manifold to new first-floor gas fireplace. Install approximately 8 ft. of 1/2" CSST transitioning to 1/2" black | Howard County | — |
| Sep 23, 2026 | Express Plumbing Permit | Rough-in plumbing for renovation of existing hall and primary bathrooms. Modify existing water supply and DWV piping as required for new tub/shower, shower, and | Howard County | — |
| Sep 21, 2026 | Express Plumbing Permit | Install plumbing rough-in for basement bathroom consisting of one (1) toilet, one (1) shower, and one (1) lavatory. Relocate existing vent piping as needed to a | Howard County | — |
| Sep 16, 2026 | Express Plumbing Permit | Install approximately 40' of new 3/4" CSST from existing 1" black steel gas main in unfinished basement. Transition to two dedicated 1/2" CSST gas lines to serv | Howard County | — |
| Aug 31, 2026 | Residential Plumbing Addition Alteration Permit | Install approximately 45 ft. of new 3/4" CSST natural gas piping from existing interior gas manifold to serve new outdoor grill and pizza oven at rear deck. New | Howard County | — |
| Aug 10, 2026 | Express Plumbing Permit | First Floor Kitchen: Remove and replace existing kitchen sink and faucet with new undermount sink and faucet in generally the same location. Modify existing hot | Howard County | — |
| Jul 31, 2026 | Express Plumbing Permit | Complete plumbing work for an existing second-floor master bathroom remodel. Reconnect and modify the existing domestic water and drain, waste, and vent piping | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed89
- Issued6
- Cancelled3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.