Contractor · Plumbing

wellington novaes farias

99 building permits since 2015 in Concord town, MA; Randolph Town city, MA and Falmouth town, MA, across 7 counties — $150,449 in reported job value over 35 permits that state one.

Building permits
99
Reported job value
$150.4K
Active
2015–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Concord town, MA26
  • Randolph Town city, MA16
  • Falmouth town, MA12
  • North Reading town, MA9
  • Cohasset town, MA7
  • Bridgewater Town city, MA7
  • Foxborough town, MA6
  • Brookline town, MA4
  • Sandwich town, MA3
  • Sandwich town, NH3

Permits by year

By issue date (application date where there is none).

01530
29
20152020202220242026*
* 2026 is year to date.
View as table
YearPermits
20151
20173
20201
202111
202220
202310
202410
202529
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing79
  • Bathrooms33
  • Gas28
  • Kitchens19
  • Remodels11
  • Water heaters9
  • HVAC7
  • Generators1

Permit types

As the building departments classify them.

  • PLUMB.71
  • GAS23
  • Residential Gas3
  • Plumbing1
  • Residential Plumbing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026PLUMB.first floor - 1 kitchen sink, 1 food disposal, 1 dishwasher, 1 ice maker fridge, 1 outside spigotRandolph Town City$2,000
Oct 15, 2026PLUMB.second floor : 1 standard bathroom (1 lavatory, 1 toilet, 1 bathtub), 1 master bathroom (2 lavatory, 1 toilet, 1 shower stall), and 1 washing machineFoxborough Town$12,000
Aug 27, 2026GAS1 furnace and 1 gas stoveFoxborough Town$2,499
Aug 10, 2026GAS1 gas water heater and 1 gas stove.Cohasset Town—
Aug 10, 2026PLUMB.1 kitchen with ice maker, 1 laundry, 1 3/4-bath, 1 gas water heater, 1 service sink and 1 ejection pump.Cohasset Town—
Jul 13, 2026PLUMB.1 master bathroom remodel on first floor.Foxborough Town$5,000
Jul 6, 2026GAS1st floor kitchen remodel -gas stoveFalmouth Town—
Jul 1, 2026PLUMB.first floor remodel of kitchen (sink, ice maker, dishwasher), remodel of half bath (toilet, sink), remodel of master bath (double vanity, toilet, sink, shower),Falmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Issued39
  • Finaled25
  • Closed20
  • Completed10
  • Cancelled3
  • Abandoned1
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.