Contractor · Electrical

DANNY R CLARK

102 building permits since 2023 in Florence city, OR; Dunes City city, OR and Tillamook County, OR, across 3 counties — $1,917,700 in reported job value over 100 permits that state one.

Building permits
102
Reported job value
$1.9M
Active
2023–2026
Latest permit
Sep 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Florence city, OR75
  • Dunes City city, OR16
  • Tillamook County, OR7
  • Lane County, OR1
  • Reedsport city, OR1
  • Springfield city, OR1
  • Tillamook city, OR1

Permits by year

By issue date (application date where there is none).

04080
62
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20233
20244
202562
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical102
  • Electric meters22
  • New construction20
  • HVAC9
  • Bathrooms8
  • Plumbing7
  • Kitchens5
  • Windows & doors5
  • Heat pumps3
  • Roofing2

Permit types

As the building departments classify them.

  • Residential Electrical59
  • Commercial Electrical43

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 21, 2026Residential Electrical- Install (1) 20 amp, 240 volt circuit to feed (1) grinder pump.Florence City$2,500
Aug 31, 2026Residential ElectricalFeed to new mobile home.Florence City$3,000
Aug 26, 2026Residential Electrical- Remove existing branch circuits in 2” conduit, exterior meter base on house, and interior house panel. - Install (1) lug kit in garage panel. - Install new 20Florence City$5,000
Aug 19, 2026Residential Electrical- Remove existing 2" mast and conductors. - Install new, 2" mast, with conductors, to maintain service drop at 36" or more above roof. - Install guy kit. - InstFlorence City$2,300
Aug 10, 2026Commercial Electrical- Delete existing meter, mast, and feed from meter to panel. - Install new 200 am, surface mounted meter base at PUD approved height. - Install (1) 2" mast and Florence City$5,000
Aug 10, 2026Residential Electrical- Install (1) 20 amp, 240 volt circuit to feed Coleman heat pump. - Install (1) 15 amp, 240 volt circuit to feed ductless disconnect. - Install (1) exterior recFlorence City$2,000
Jul 31, 2026Commercial ElectricalTesla Electric Vehicle Charging Station (Valuation TBD)Springfield City—
Jul 17, 2026Commercial ElectricalSite 1A - Delete existing 30 amp pedestal. - Install (1) 60 amp, 240 volt, 4-wire circuit to feed (1) metered 50/30/20 direct burial pedestal and new digital meFlorence City$3,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled87
  • Issued9
  • Completed4
  • Closed1
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.