Contractor · HVAC

Miller Heating & Cooling

104 building permits since 2013 in Stump Sound township, NC; Sneads Ferry CDP, NC and Onslow County, NC, across 2 counties — $168,945 in reported job value over 10 permits that state one.

Building permits
104
Reported job value
$168.9K
Active
2013–2022
Latest permit
Apr 11, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stump Sound township, NC75
  • Sneads Ferry CDP, NC12
  • Onslow County, NC11
  • Jacksonville city, NC4
  • Jacksonville township, NC1
  • Pender County, NC1

Permits by year

By issue date (application date where there is none).

012.525
23
20132016201820202022
View as table
YearPermits
20131
20141
20166
201723
201823
201919
202021
20218
20222

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC99
  • Heat pumps16
  • Electrical7
  • Gas2
  • Windows & doors2
  • Additions1
  • Generators1

Permit types

As the building departments classify them.

  • Residential Mechanical - Change Out79
  • Commercial Mechanical - Commercial Change Out6
  • Residential Mechanical - Residential Mechanical.24
  • MECHANICAL/ELECTRICAL-CHANGE OUT/HOOK UP UNIT3
  • Residential Building - Single Family Dwelling2
  • Residential Electrical - New2
  • Residential Mechanical - New2
  • Commercial Fire - Commercial FAI1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 11, 2022Residential Mechanical - Change OutChange out systemStump Sound township—
Apr 11, 2022Residential Mechanical - Change OutChanging out two systemsStump Sound township—
Jul 22, 2021Residential Mechanical - Change OutChange out systemStump Sound township—
May 11, 2021Residential Mechanical - Change OutChange out existing systemStump Sound township—
Mar 26, 2021Residential Mechanical - Change OutRemoving indoor and outdoor unit and installing new in same locationOnslow County—
Mar 16, 2021Commercial Mechanical - Commercial Change OutRemoving existing 4 ton Heat Pump system, indoor and outdoor and installing a new 4 ton heat pump system in same location.Sneads Ferry CDP—
Mar 11, 2021MECHANICAL/ELECTRICAL-CHANGE OUT/HOOK UP UNITTHE RESULTS COJacksonville City$17,500
Feb 24, 2021Residential Mechanical - Change OutRemoving both indoor & outdoor units for the 1st and the 2nd floor installingnew in some locationStump Sound township—

Permit status

Where its permits stand, as the departments report them.

  • Expired50
  • Completed38
  • Approved9
  • Void4
  • Closed1
  • Issued1
  • Documents submitted1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.