Contractor · Electrical

Kevin Farrell

104 building permits since 2000 in Boston city, MA; Waltham city, MA and Walpole town, MA, across 12 counties — $3,969,236 in reported job value over 97 permits that state one.

Building permits
104
Reported job value
$4M
Active
2000–2026
Latest permit
Apr 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA23
  • Waltham city, MA12
  • Walpole town, MA10
  • Dedham town, MA8
  • Somerville city, MA7
  • Hingham town, MA6
  • Marshfield town, MA4
  • Bourne town, MA3
  • Quincy city, MA3
  • Westerly town, RI3

Permits by year

By issue date (application date where there is none).

012.525
23
20002005201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20002
20022
20041
20052
20061
20092
20112
20122
20131
201410
20154
20162
20173
20185
20196
202015
20216
20222
20239
202423
20252
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical45
  • Telecom29
  • Electric meters8
  • Additions5
  • EV chargers5
  • Generators4
  • Remodels3
  • Windows & doors2
  • Gas1
  • Kitchens1

Permit types

As the building departments classify them.

  • Electrical Permit20
  • ELECT.11
  • Building Permit-All One and Two Family10
  • Antennas - Wireless9
  • CELL9
  • Building Permit6
  • ELECTRICAL5
  • OTHER5

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 27, 2026COBCOBBoston City$350,000
Jan 23, 2026Electrical PermitUtility Pole in sidewalk, install 100 amp OH service on pole to power pole mounted RF equipment and pole top antenna. Install weatherhead, mast, meter socket anDedham Town$3,900
Jun 9, 2025Building PermitModification to ExistingWesterly Town$28,000
Jan 16, 2025ELECTinstall 600a utility pad mount xfmr svce. to power cabinet & (3) ev chargers, 600a distribution cabinet w/(3) 200a circuits to power ev chargers; includes conduBellingham Town$58,000
Dec 5, 2024Electrical PermitInstall a 200A breaker in (E) meter bank and new 200A panel at equipment pad location for new Verizon service; install 30Kw LP gas generator; includes all conduReading Town$29,150
Dec 3, 2024ELECT.reference bp #c-24-0965; insta...Hingham Town$3,500
Nov 20, 2024Electrical Permit - Commercial—Marlborough City$57,000
Nov 12, 2024Franklin Electrical PermitINSTALL NEW 600A UTILITY PAD MOUNT TRANSFORMER SERVICE TO POWER DISTRIBUTION CABINET & (3) EV CHARGERS; AND 600A DISTRIBUTION CABINET W/(3) 200A CIRCUITS TO POWFranklin Town City$65,300

Permit status

Where its permits stand, as the departments report them.

  • Completed40
  • Active27
  • Not stated12
  • Issued11
  • Closed8
  • Finaled4
  • Withdrawn2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.