Contractor · Specialty (solar, fire, telecom)

POWER NORTHWEST INCORPORATED

105 building permits since 2021 in Hillsboro city, OR; Columbia County, OR and Marion County, OR, across 9 counties — $5,067,925 in reported job value over 85 permits that state one.

Building permits
105
Reported job value
$5.1M
Active
2021–2026
Latest permit
Oct 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Hillsboro city, OR20
  • Columbia County, OR14
  • Marion County, OR10
  • Salem city, OR8
  • Tualatin city, OR8
  • Bend city, OR5
  • Tillamook County, OR4
  • Keizer city, OR4
  • Seaside city, OR4
  • Tigard city, OR4

Permits by year

By issue date (application date where there is none).

02040
31
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20216
202218
20237
202431
202525
2026 (YTD)18

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar82
  • Electrical32
  • Battery storage17
  • Remodels4
  • Additions4
  • Roofing3
  • EV chargers1
  • Electric meters1

Permit types

As the building departments classify them.

  • Residential Structural24
  • Alternate Energy20
  • Residential Electrical15
  • SOLAR - RESIDENTIAL 1 AND 28
  • Commercial Structural7
  • Electrical7
  • Residential Revision6
  • Commercial Electrical5

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 21, 2026Electrical Permit - Residential - Renewable Energy19.36 KW Roof Mounted Solar Array + 2 Franklin batteriesSalem City$159,708
Oct 15, 2026ElectricalInstall 330.4kW (75K as by invertor AC output) grid tied rooftop solar system on the OSU-Cascades Obsidian Hall building ***No Conditions/No Expired*** SNBend—
Sep 9, 2026ElectricalInstall 91.45kW grid-tied rooftop solar system on the OSU-Cascades DUP2/CETS utility buildings. *No expired or conditions*Bend—
Sep 1, 2026Electrical Permit - Residential - AlterationMeter Main UpgradeSalem City—
Aug 18, 2026Residential ElectricalBrenda Freshman 19.8 KW Roof Mounted Solar Array + BatteryTillamook County$39,976
Aug 18, 2026Residential StructuralFRESHMAN 19.8 KW Roof Mounted Solar Array + BatteryTillamook County$39,976
Aug 11, 2026ElectricalInstall 100.3kW (DC) grid-tied rooftop solar system. ***Changed "Addition" to Electrical*** SN ***No Conditions/No Expired (see comments)*** SNBend$78,842
Jul 16, 2026ElectricalInstall 368.16kW grid tied rooftop solar system on the OSU-Cascades Residence Hall building no expired/conditions chwBend—

Permit status

Where its permits stand, as the departments report them.

  • Issued48
  • Finaled38
  • Closed6
  • Withdrawn6
  • Additional information required4
  • Expired2
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.