Contractor · Specialty (solar, fire, telecom)
POWER NORTHWEST INCORPORATED
105 building permits since 2021 in Hillsboro city, OR; Columbia County, OR and Marion County, OR, across 9 counties — $5,067,925 in reported job value over 85 permits that state one.
- Building permits
- 105
- Reported job value
- $5.1M
- Active
- 2021–2026
- Latest permit
- Oct 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Hillsboro city, OR20
- Columbia County, OR14
- Marion County, OR10
- Salem city, OR8
- Tualatin city, OR8
- Bend city, OR5
- Tillamook County, OR4
- Keizer city, OR4
- Seaside city, OR4
- Tigard city, OR4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 6 |
| 2022 | 18 |
| 2023 | 7 |
| 2024 | 31 |
| 2025 | 25 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar82
- Electrical32
- Battery storage17
- Remodels4
- Additions4
- Roofing3
- EV chargers1
- Electric meters1
Permit types
As the building departments classify them.
- Residential Structural24
- Alternate Energy20
- Residential Electrical15
- SOLAR - RESIDENTIAL 1 AND 28
- Commercial Structural7
- Electrical7
- Residential Revision6
- Commercial Electrical5
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2026 | Electrical Permit - Residential - Renewable Energy | 19.36 KW Roof Mounted Solar Array + 2 Franklin batteries | Salem City | $159,708 |
| Oct 15, 2026 | Electrical | Install 330.4kW (75K as by invertor AC output) grid tied rooftop solar system on the OSU-Cascades Obsidian Hall building ***No Conditions/No Expired*** SN | Bend | — |
| Sep 9, 2026 | Electrical | Install 91.45kW grid-tied rooftop solar system on the OSU-Cascades DUP2/CETS utility buildings. *No expired or conditions* | Bend | — |
| Sep 1, 2026 | Electrical Permit - Residential - Alteration | Meter Main Upgrade | Salem City | — |
| Aug 18, 2026 | Residential Electrical | Brenda Freshman 19.8 KW Roof Mounted Solar Array + Battery | Tillamook County | $39,976 |
| Aug 18, 2026 | Residential Structural | FRESHMAN 19.8 KW Roof Mounted Solar Array + Battery | Tillamook County | $39,976 |
| Aug 11, 2026 | Electrical | Install 100.3kW (DC) grid-tied rooftop solar system. ***Changed "Addition" to Electrical*** SN ***No Conditions/No Expired (see comments)*** SN | Bend | $78,842 |
| Jul 16, 2026 | Electrical | Install 368.16kW grid tied rooftop solar system on the OSU-Cascades Residence Hall building no expired/conditions chw | Bend | — |
Permit status
Where its permits stand, as the departments report them.
- Issued48
- Finaled38
- Closed6
- Withdrawn6
- Additional information required4
- Expired2
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.