Contractor · Electrical

Jack Nemensky

105 building permits since 2017 in Southborough town, MA; Marlborough city, MA and Grafton town, MA, across 5 counties — $70,200 in reported job value over 25 permits that state one.

Building permits
105
Reported job value
$70.2K
Active
2017–2026
Latest permit
Oct 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Southborough town, MA77
  • Marlborough city, MA12
  • Grafton town, MA6
  • North Attleborough Town city, MA1
  • Acton town, MA1
  • Groton town, MA1
  • Hudson town, MA1
  • Bellingham town, MA1
  • Franklin Town city, MA1
  • Walpole town, MA1

Permits by year

By issue date (application date where there is none).

01530
29
2017202220242026*
* 2026 is year to date.
View as table
YearPermits
20171
20211
20225
202329
202426
202521
2026 (YTD)22

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical105
  • HVAC36
  • Remodels15
  • Bathrooms8
  • Kitchens5
  • Additions3
  • EV chargers3
  • Gas2
  • Heat pumps2
  • Electric meters2

Permit types

As the building departments classify them.

  • Electrical Permit87
  • Electrical Permit - Residential 1 & 2 Family9
  • Electrical Permit - Commercial3
  • ELECT1
  • ELECTRICAL1
  • Electrical Permit Application1
  • Electrical Permit RESIDENTIAL One and Two Family1
  • Franklin Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2026Electrical Permitwire replacement oil fired boilerSouthborough Town—
Oct 5, 2026Electrical Permit - Residential 1 & 2 Family—Marlborough City$4,000
Oct 1, 2026Franklin Electrical PermitMain bath renovation: vanity outlet, replace exhaust fan, shower light, vanity light, 1 ceiling light, AFCI and/or GFCI as per code.Franklin Town City$2,500
Sep 22, 2026Electrical PermitProper wiring for existing boiler. Apparently, the boiler was installed and wired illegally at some time in the past.Southborough Town—
Aug 18, 2026Electrical Permitwiring for replacement oil fired boilerSouthborough Town—
Aug 6, 2026Electrical PermitKitchen renovationSouthborough Town—
Jul 31, 2026Electrical PermitRemove existing 3-phase, 120/208 volt, 125-amp,12 circuit breaker panel located in "dog house" on pole @ south side of lot. Replace with new 125-amp, 3-phase maSouthborough Town—
Jun 12, 2026Electrical PermitInstall separate circuit, 15 amp AFCI protected outlet at bottom of stairs for stair lift.Southborough Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed76
  • Active29

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.