Contractor · Electrical

Royal Electrical Contractors LLC

106 building permits since 2021 in Brunswick County, NC; Pender County, NC and Stump Sound township, NC, across 3 counties — $26,600,642 in reported job value over 65 permits that state one.

Building permits
106
Reported job value
$26.6M
Active
2021–2026
Latest permit
Oct 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brunswick County, NC51
  • Pender County, NC38
  • Stump Sound township, NC7
  • Surf City town, NC4
  • Burgaw town, NC3
  • Sneads Ferry CDP, NC2
  • White Oak township, NC1

Permits by year

By issue date (application date where there is none).

02040
33
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20216
202216
202318
202419
202514
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical97
  • Electric meters10
  • Generators6
  • EV chargers6
  • Bathrooms4
  • Plumbing4
  • Remodels3
  • Roofing3
  • Additions3
  • Gas2

Permit types

As the building departments classify them.

  • Residential Electrical Stand Alone Permit38
  • INC ELEC19
  • T-POLE17
  • ELECTRICAL11
  • Meterbase Change Out2
  • Residential Accessory - Dock and Pier2
  • Residential Electrical - Change Out2
  • Residential Electrical - New2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 12, 2026Residential Accessory52x50 half-enclosed pole barn with 200 amp service, no plumbing, no hvac.Pender County—
Oct 5, 2026ELECTRICALInstalling an 18KW standby generator as well as installing a new 200A meter base / automatic transfer switch combination panel to accommodate the existing 200A Brunswick County$13,000
Oct 5, 2026RECONNECTInstalling an 18KW standby generator as well as installing a new 200A meter base / automatic transfer switch combination panel to accommodate the existing 200A Brunswick County$13,000
Sep 16, 2026Residential Electrical Stand Alone PermitInstalling a service pole to service the gate entering the property.Pender County—
Sep 9, 2026Residential Electrical Stand Alone PermitInstalling service pole for a security light.Pender County—
Sep 5, 2026Residential Electrical - Change OutRelocating existing dock panel to the head of the dock.Sneads Ferry CDP—
Aug 19, 2026Residential Electrical Stand Alone PermitInstalling a service pole for security light.Pender County—
Aug 18, 2026Residential Electrical Stand Alone PermitInstalling a 200 amp service on a detached garage. Need Permit for shed before completing electrical permit Per Jimmie Stokes. Started Work before Permit.Pender County—

Permit status

Where its permits stand, as the departments report them.

  • Active51
  • Completed27
  • Issued9
  • Expired9
  • Approved3
  • Cancelled3
  • Void2
  • Additional information required2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.