Contractor · HVAC
KEVIN P MCCORMACK
106 building permits since 2021 in Greenwich town, CT; Trumbull town, CT and Norwalk town, CT, across 2 counties — $473,850 in reported job value over 30 permits that state one.
- Building permits
- 106
- Reported job value
- $473.9K
- Active
- 2021–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT89
- Trumbull town, CT6
- Norwalk town, CT6
- Monroe town, CT2
- Stratford town, CT2
- Fairfield town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 5 |
| 2022 | 21 |
| 2023 | 19 |
| 2024 | 20 |
| 2025 | 28 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC106
- Electrical56
- Heat pumps39
- Gas31
- Plumbing31
- Additions8
- Remodels4
- Kitchens3
- Bathrooms3
- Roofing2
Permit types
As the building departments classify them.
- HVAC76
- HV212
- Residential Mechanical Permit7
- Mech No Fee5
- Mechanical Permit2
- Commercial Mechanical Permit1
- Mech Alt Res1
- Mechanical - Heating and Cooling1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Mechanical - Heating and Cooling | NO HEAT DIRECT REPLACEMENT OF EXISTING FURNACE WITH A NEW TRANE 80,000btu 2 STAGE GAS FURNACE WITH A 4 TON BLOWER. | Fairfield Town | $3,500 |
| Oct 28, 2026 | Mechanical Permit | Installation of a Mitsubishi Hyper heat pump system to include a 2 ton airhandler and a 2ton hyper heat condenser. Includes all necessary ductwork , all electri | Stratford Town | $18,500 |
| Oct 28, 2026 | Mechanical Permit | installation of a ducted Mitsubishi Heat pump System to include a 2ton airhandler and a 2ton hyper heat condenser. includes all necessary ductwork , electrical | Stratford Town | $18,500 |
| Oct 23, 2026 | HVAC | Install Mitsubishi ductless mini-split system to serve the new Sitting Room includes a 12000 btu wall mounted A/R Handler and a 12000 btu hyper heat condenser. | Greenwich Town | — |
| Oct 22, 2026 | HVAC | Install Mitsubishi ducted A/R Handler and a 6000 and 9000 btu wall-mounted ductless air handlers, 5k backup heater on the air handler; Includes all necessary du | Greenwich Town | — |
| Oct 15, 2026 | Residential Mechanical Permit | Sub-contractor under RB-26-259 Installation of a ducted warm air and central ac system to include a Lennox 90,000BTU gas furnace with a 4ton blower and a 4ton R | Trumbull Town | $25,000 |
| Aug 18, 2026 | HVAC | Rework the supply outlets in guest suite and relocate the walk-in closet outlet to accommodate the work being done on building permit. | Greenwich Town | — |
| Aug 5, 2026 | HVAC | install 2 ducted central warm-air and a/c systems to serve the 1st and 2nd flrs.; 1st flr. new Lennox 90000 btu furnace, 4 ton evap. coil and 4 ton a/c; 2nd fl. | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed72
- Active30
- Void1
- Issued1
- Pending1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.