Contractor · Electrical
Applicant: Greg Albright of Freedom Forever Texas, LLC
106 building permits since 2024 in Temple city, TX — $22,690,100 in reported job value over 20 permits that state one.
- Building permits
- 106
- Reported job value
- $22.7M
- Active
- 2024–2026
- Latest permit
- Mar 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Temple city, TX106
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 61 |
| 2025 | 40 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar57
- Electrical55
- Battery storage8
- Roofing3
Permit types
As the building departments classify them.
- Building Solar Panels55
- BuildingSolar Panels47
- BuildingSolarPanels1
- Electric Service Upgrade1
- Residential Roofing1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 26, 2026 | Building Solar Panels | 7.79 kW solar service system 19 (410W) roof mounted solar panels | Temple | — |
| Mar 26, 2026 | Building Solar Panels | 5.33 kW solar service system with Tesla Powerwall 3 | Temple | — |
| Aug 14, 2025 | Building Solar Panels | Add on to existing system: Install 10 (405W) roof mounted solar panels, 4.050 kW solar service system tying into existing 200 AMP rated MSP with solaredge energ | Temple | — |
| Aug 14, 2025 | Building Solar Panels | Install 25 (410W) roof mounted solar panels, 10.250 kW solar service system tying into existing 200 AMP rated MSP with solaredge energy bank | Temple | — |
| Aug 7, 2025 | Building Solar Panels | Install 20 (410W) roof mounted solar panels, 8.200 kW solar service system tying into existing 200 AMP rated MSP | Temple | — |
| Jul 31, 2025 | Building Solar Panels | Install 37 (410W) roof mounted solar panels, 15.170 kW solar service system tying into existing 225 AMP rated back up load center with 2 solaredge energy banks | Temple | — |
| Jul 31, 2025 | Building Solar Panels | Add on to existing system: Install 21 (410W) roof mounted solar panels, 8.610 kW solar service system tying into existing 200 AMP rated MSP with 2 Solaredge ene | Temple | — |
| Jul 31, 2025 | Building Solar Panels | Install 36 (410W) roof mounted solar panels, 14.760 kW solar service system tying into existing 225 AMP rated backup load center with 2 solaredge energy banks | Temple | — |
Permit status
Where its permits stand, as the departments report them.
- Closed38
- Issued26
- Expired19
- Finaled5
- Pending5
- Documents submitted5
- Reviews in progress4
- Not stated3
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- APPLICANT GREG ALBRIGHTOF FREEDOMFOREVER TEXAS LLC
- APPLICANT GREG ALBRIGHTOFFREEDOM FOREVER TEXAS LLC
- APPLICAN T GRE G ALBRIGHTOFFREEDOM FOREVER TEXAS LLC
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.