Contractor · Electrical

ALTADENA ENERGY & SOLAR INC

106 building permits since 2013 in Los Angeles city, CA — $68,330 in reported job value over 1 permits that state one.

Building permits
106
Reported job value
$68.3K
Active
2013–2026
Latest permit
Mar 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA106

Permits by year

By issue date (application date where there is none).

012.525
22
201420162018202020222026*
* 2026 is year to date.
View as table
YearPermits
20135
20142
20155
201610
20175
201810
201914
20209
202118
202222
20234
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical100
  • Solar25
  • Battery storage7
  • Roofing5
  • Plumbing5
  • HVAC1

Permit types

As the building departments classify them.

  • Electrical100
  • Plumbing5
  • Bldg-Alter/Repair1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 12, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Jan 7, 2026ElectricalEplan) pv1 for installation of roof mounted solar system and installation of energy storage system. Pv system includes 24 modules, 1 powerwall3 hybrid, 1 subpanLos Angeles City—
Mar 29, 2023Electrical[EPLAN] PV1 PLAN CHECK FOR NEW ROOF MOUNTED PV SYSTEM. SYSTEM SIZE ISLos Angeles City—
Mar 22, 2023Electrical—Los Angeles City—
Jan 19, 2023Electrical[eplan] Install 8.4 kW DC roof mounted PV system with 21 kWh energy stLos Angeles City—
Jan 5, 2023Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 4.35KWac, SYSTELos Angeles City—
Nov 8, 2022Electrical[eplan] Roof Mount Solar system rated at 4.4KW DC/ 3.4KW AC with (12)Los Angeles City—
Oct 24, 2022ElectricalPV1. Install solar PV & BESS system on single family home. System comLos Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated103
  • Active2
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

ALTADENA ENERGY & SOLAR INC — Building Permits & Contractor Profile | Buildstats