Contractor · Electrical
SPARTAN CONSTRUCTION
107 building permits since 2012 in Los Angeles city, CA; Sacramento County, CA and San Diego County, CA, across 10 counties — $1,374,521 in reported job value over 46 permits that state one.
- Building permits
- 107
- Reported job value
- $1.4M
- Active
- 2012–2023
- Latest permit
- Feb 22, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA47
- Sacramento County, CA21
- San Diego County, CA8
- Riverside city, CA6
- Sacramento city, CA5
- Elk Grove city, CA4
- Marin County, CA3
- Tuolumne County, CA2
- Citrus Heights city, CA2
- Davis city, CA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 1 |
| 2017 | 2 |
| 2018 | 6 |
| 2019 | 8 |
| 2020 | 1 |
| 2021 | 41 |
| 2022 | 39 |
| 2023 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical62
- Solar55
- Plumbing8
- Roofing6
- Water heaters4
- Battery storage3
- Electric meters3
- HVAC2
- Remodels1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical40
- MISR11
- Residential6
- Single Family5
- COXX4
- ELECTRICAL4
- Plumbing4
- CBNR3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 22, 2023 | CBNR | Ground Mounted PV Solar System 12.64 kW, CH-01 = Change in contactor. Main service panel existing amps corrected to reflect the equipment on site., Change 02: 1 | Sacramento County | $43,848 |
| Feb 22, 2023 | COXX | Change 02: 12.64 kW ground mount PV solar application updated equipment and wire sizing. Switch to IQ8PLUS microinverter and Canadian 395 Panels. PV load sheddi | Sacramento County | — |
| Oct 27, 2022 | Residential | INSTALL PV SOLAR SYSTEM WITH (33) PHOTOVOLTAIC PANEL ON RESIDENTIAL ROOF - 13.04 KW **MAIN SERVICE PANEL UPGRADE UNDER SEPARATE PERMIT** SJS | Riverside City | $28,596 |
| Sep 20, 2022 | Electrical | (E-PLAN) NEW PV1 ROOF-MOUNTED INSTALLATION. SCOPE OF WORK INCLUDES 16 | Los Angeles City | — |
| Aug 1, 2022 | Electrical | — | Los Angeles City | — |
| Jul 1, 2022 | Electrical | — | Los Angeles City | — |
| Jun 23, 2022 | Single Family | 6.715kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will | Sacramento | $16,342 |
| May 25, 2022 | RESIDENTIAL | 11.455 kW rooftop PV solar installation with Enphase Encharge 10 energy storage system (10.08 kWh) | Marin County | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated51
- Completed19
- Issued17
- Finaled6
- Active4
- Cancelled4
- Closed3
- Expired3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.