Contractor · Electrical

Thomas Price

108 building permits since 2008 in Cumberland town, RI; East Providence city, RI and Providence city, RI, across 11 counties — $640,915 in reported job value over 90 permits that state one.

Building permits
108
Reported job value
$640.9K
Active
2008–2026
Latest permit
Oct 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Cumberland town, RI15
  • East Providence city, RI13
  • Providence city, RI11
  • Wareham town, MA10
  • Attleboro city, MA8
  • Boston city, MA6
  • Warwick city, RI6
  • Cranston city, RI5
  • Canton town, MA3
  • Pawtucket city, RI3

Permits by year

By issue date (application date where there is none).

01020
19
20132016202020232026*
* 2026 is year to date.
View as table
YearPermits
20081
20133
20141
20151
20163
201811
20196
20208
202111
20228
202310
202411
202519
2026 (YTD)15

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical105
  • HVAC40
  • Plumbing4
  • Remodels3
  • Roofing3
  • Additions3
  • Demolition3
  • Electric meters3
  • New construction3
  • Heat pumps2

Permit types

As the building departments classify them.

  • Electrical Permit79
  • ELECT.12
  • ELECTRICAL6
  • 2) Electrical Permit5
  • Electrical Permit Application2
  • COMM.1
  • Demolition Permit1
  • Electrical Permit - RESIDENTIAL ONLY1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 15, 2026ELECT.—Fairhaven Town—
Sep 17, 2026Electrical PermitRun new circuits for lighting and install 23 new lighting fixtures in ceiling grid. New circuit for bathroom ceiling fan, and support all loose wiring in ceilinEast Providence City$3,500
Aug 26, 2026Electrical PermitDisconnect and make safe 2 old cooling towers, and their associated variable frequency drives. Adjust piping as needed and rewire new VFDs and cooling towers utWarwick City$18,000
Aug 19, 2026ELECT.—Attleboro City—
Aug 19, 2026ELECT.—Attleboro City—
Jul 24, 2026Electrical PermitDisconnect and make safe old low voltage hvac control wiring in basement of admin building. Wire new low voltage controls for new air handler unit in mechanicalDedham Town$18,000
Jul 22, 2026Electrical PermitDisconnect and make safe old low voltage control wiring and sensors for air handler unit 3. Install sensors temporarly on rental unit located outside while new Wareham Town$15,000
Jul 17, 2026Electrical PermitWire 2 temporary rental chillers outside of the main chiller plantWarwick City$5,000

Permit status

Where its permits stand, as the departments report them.

  • Completed47
  • Active46
  • Finaled6
  • Issued5
  • Closed3
  • Approved1

Also on file as

The same name elsewhere

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.