Contractor · Electrical
ECOPOWER ELECTRIC CORPORATION
109 building permits since 2018 in St. Louis city, MO; St. Louis County, MO and Jefferson County, MO, across 3 counties — $1,709,089 in reported job value over 103 permits that state one.
- Building permits
- 109
- Reported job value
- $1.7M
- Active
- 2018–2026
- Latest permit
- Nov 5, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- St. Louis city, MO61
- St. Louis County, MO22
- Jefferson County, MO6
- Kirkwood city, MO6
- Wildwood city, MO4
- Creve Coeur city, MO2
- Glendale city, MO2
- Sunset Hills city, MO2
- Crestwood city, MO1
- Crystal Lake Park city, MO1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 4 |
| 2020 | 10 |
| 2021 | 10 |
| 2022 | 11 |
| 2023 | 9 |
| 2024 | 5 |
| 2025 | 16 |
| 2026 (YTD) | 43 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical98
- Remodels18
- Bathrooms14
- Gas9
- Generators9
- Electric meters9
- HVAC8
- Battery storage8
- Kitchens8
- Pools & hot tubs6
Permit types
As the building departments classify them.
- ELECTRICAL61
- ELECTRICAL RESIDENTIAL ELECTRICAL28
- Electrical4
- Electric (Residential)4
- BUILDING COMMERCIAL EXISTING BUILDING3
- BUILDING RESIDENTIAL NON-HABITABLE2
- BUILDING MULTIFAMILY EXISTING BUILDING1
- BUILDING RESIDENTIAL EXISTING BUILDING (INTEGRATED/NON-INTEGRATED)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 5, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Supply and install a 26kW 120/240V single-phase air-cooled standby generator with two 200-amp 120/240V single-phase automatic transfer switches, five 50-amp loa | St. Louis County | $20,000 |
| Nov 5, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Supply and install a 26kW 120/240V single-phase air-cooled standby generator with two 200-amp 120/240V single-phase automatic transfer switches, five 50-amp loa | Wildwood City | $20,000 |
| Nov 4, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | ***PREMISE NUMBER IS MISSING A DIGIT. IF IT STARTS WITH A ZERO, PLEASE TYPE THE PREMISE NUMBER IN THE DESCRIPTION OF WORK AND RESUBMIT YOUR APPLICATION. OUR SYS | Wildwood City | $20,000 |
| Nov 4, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | ***PREMISE NUMBER IS MISSING A DIGIT. IF IT STARTS WITH A ZERO, PLEASE TYPE THE PREMISE NUMBER IN THE DESCRIPTION OF WORK AND RESUBMIT YOUR APPLICATION. OUR SYS | St. Louis County | $20,000 |
| Nov 2, 2026 | ELECTRICAL | ENRIGHT AVE | St. Louis City | $2,000 |
| Nov 2, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | ***PLEASE REAPPLY AND FILL IN DEVICE INFORMATION AREA INCLUDING ALL THE SERVICE INFORMATION.THANK YOU.***26kW 120/240V Single Phase Air-Cooled Generac Standby G | Wildwood City | $20,000 |
| Nov 2, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | ***PLEASE REAPPLY, THE DESCRIPTION OF WORK AND DEVICE INFORMATION NEED TO MATCH.***26kW 120/240V Single Phase Air-Cooled Generac Standby Generator with 200A Aut | Wildwood City | $25,000 |
| Nov 2, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | ***PLEASE REAPPLY AND FILL IN DEVICE INFORMATION AREA INCLUDING ALL THE SERVICE INFORMATION.THANK YOU.***26kW 120/240V Single Phase Air-Cooled Generac Standby G | St. Louis County | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued79
- Void11
- Completed10
- Closed6
- Expired2
- Pending payment1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- ECOPOWER ELECTRIC
- ECO POWER ELECTRIC
- ECOPOWER ELECTRIC ECO POWE
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.