Contractor · General building
DEVAUGHN RIP RAP STONEWALLS, LLC
109 building permits since 2014 in Crystal River city, FL and Citrus County, FL.
- Building permits
- 109
- Reported job value
- —
- Active
- 2014–2026
- Latest permit
- Oct 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Crystal River city, FL97
- Citrus County, FL12
Permits by year
By issue date (application date where there is none).
012.525
24
201420162018202020242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 4 |
| 2015 | 14 |
| 2016 | 10 |
| 2017 | 24 |
| 2018 | 7 |
| 2019 | 14 |
| 2020 | 1 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 15 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Additions1
- Generators1
- Windows & doors1
- New construction1
Permit types
As the building departments classify them.
- Building80
- Res - Seawall12
- Waterfront Structure12
- Com - Seawall2
- FENCING/LANDSCAPING1
- Res - Dock/Boat Launch1
- Res - Minor Flood Repair1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 22, 2026 | Waterfront Structure | COMM-----Construct 91 linear feet rip rap with 30-inch concrete cap. RIVER COVE LANDINGS CONDOS / FLOOD ZONE: VE - BFE: 14.0' NAVD - DFE: 15.0' NAVD - NEW CONST | Citrus County | — |
| Oct 13, 2026 | Res - Seawall | TIEBACKS AND 30" CONCRETE CAP | Crystal River | — |
| Sep 23, 2026 | Waterfront Structure | Repurchase of BLD202107009 **ADD INSPECTIONS ONLY**- INSTALL 80LF OF RIP RAP SEAWALL 30" WIDE CONCRETE CAP * NOC FOR SEAWALL IN OR BK 3709 PG 2321 | Citrus County | — |
| Sep 21, 2026 | Waterfront Structure | Install 100 feet rip rap seawall with 36" concrete cap | Citrus County | — |
| Aug 17, 2026 | Res - Seawall | 30" CONCRETE ON EXISTING RIP RAP 90 FT NO BACK FILL RAISE EXISTING CAP NO TIE BACK. | Crystal River | — |
| Jul 30, 2026 | Com - Seawall | 30" CONCRETE CAP ON EXISTING RIP RAP 90 FT NO BACKFILL. RAISE EXISTING CAP. NO TIE BACK. | Crystal River | — |
| Jul 30, 2026 | Res - Seawall | SEAWALL REPAIR. RAISE EXISTING SEAWALL CAP 10". NO TIE-BACKS NEEDED. NO FILL DIRT. | Crystal River | — |
| Jun 9, 2026 | Res - Seawall | RAISE EXISTING CRAWL SPACES 5 PLACES. RAISE 5 BLOCKS HIGH STOP FLOODING. | Crystal River | — |
Permit status
Where its permits stand, as the departments report them.
- Closed86
- Issued8
- Abandoned5
- Expired4
- Pending3
- Cancelled3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.