Contractor · Electrical

Brito

109 building permits since 2022 in Los Angeles city, CA.

Building permits
109
Reported job value
—
Active
2022–2023
Latest permit
May 17, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA109

Permits by year

By issue date (application date where there is none).

04080
71
20222023
View as table
YearPermits
202271
202338

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical108
  • Solar81
  • Roofing12
  • Battery storage7
  • Remodels1
  • Fire sprinklers1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical108
  • Fire Sprinkler1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 17, 2023Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 3.9kwdc/3.8KWacLos Angeles City—
May 16, 2023Electrical[ePlan][PV1] Installation of a new 7.1kWDC/6kWAC PV system with 18 modLos Angeles City—
May 5, 2023Electrical[ePlan] New roof-mounted solar PV1 system with ESS. Scope of work inclLos Angeles City—
May 5, 2023Electrical[EPLAN] NEW ROOFTOP MOUNTED PV1 INSTALLATION WITH (27) MODULES, (27) OLos Angeles City—
May 1, 2023Electrical(EPlan) PV1 PC for installation roof mounted solar panels and installaLos Angeles City—
Apr 25, 2023Electrical[EPLAN] PV1 PLAN CHECK FOR NEW ROOF MOUNTED PV SYSTEM AND ESS. ESS SIZLos Angeles City—
Apr 24, 2023Electrical[EPLAN] PV1 Residential for new ess and pv solar system. PV system sizLos Angeles City—
Apr 24, 2023Electrical(EPlan) PV1 PC for installation of roof mounted solar panels and instaLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.