Contractor · Electrical

PACIFIC LIGHTS INTERNATIONAL

111 building permits since 2007 in Los Angeles city, CA; Burbank city, CA and West Hollywood city, CA.

Building permits
111
Reported job value
—
Active
2007–2026
Latest permit
Feb 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA106
  • Burbank city, CA4
  • West Hollywood city, CA1

Permits by year

By issue date (application date where there is none).

01020
20
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20071
20142
20156
20165
201710
201812
201919
20206
202120
202214
20234
20242
20251
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical109
  • Solar6
  • Battery storage3
  • Electric meters2
  • Remodels1
  • Roofing1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical107
  • Solar2
  • ELECTRICAL1
  • Electrical Service1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 20, 2026ElectricalInstall new 200amp service located on address 1215-1215 1/2 s point view st to also service address 1217 s point view st "comply with department order effectiveLos Angeles City—
Feb 17, 2026ElectricalEplan) pv1 for installation of roof mounted solar panels and installation of energy storage system. Pv system includes 22 modules, (2) powerwall3 hybrid, tesla Los Angeles City—
Feb 17, 2026ElectricalInstall sub panelLos Angeles City—
Feb 9, 2026ElectricalEplan) plan check only for revision to an approved set under clouded areas only. Scope of work includes changes to the feeder schedule and single line diagram. Los Angeles City—
Feb 8, 2026ElectricalUpgrade service to 400aLos Angeles City—
Feb 5, 2026ElectricalInstall an electrical vehicle charger(s) in a single-family dwelling.Los Angeles City—
Jan 12, 2026ElectricalPlan check only. Pv installation of roof mounted solar panels. Pv system includes 8 modules with 4 microinverters connected to the subpanel. System size 3.28kw Los Angeles City—
Jan 9, 2026ElectricalInstalling (upgrading) main service panel 200aLos Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated97
  • Finaled8
  • Active5
  • Expired1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • PACIFIC LIGHTS INT
  • PACIFIC LIGHTS INTERNATION

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.