Contractor · General building

Justin Zeller

111 building permits since 2018 in Providence city, RI; Barrington town, RI and East Greenwich town, RI, across 7 counties — $4,560,725 in reported job value over 104 permits that state one.

Building permits
111
Reported job value
$4.6M
Active
2018–2026
Latest permit
Oct 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI47
  • Barrington town, RI12
  • East Greenwich town, RI10
  • Warwick city, RI8
  • East Providence city, RI5
  • Tiverton town, RI4
  • Cranston city, RI4
  • Pawtucket city, RI4
  • North Kingstown town, RI3
  • Needham town, MA2

Permits by year

By issue date (application date where there is none).

01020
19
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20181
20194
202012
20219
202214
202319
202419
202516
2026 (YTD)17

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms38
  • Remodels36
  • Kitchens30
  • Windows & doors30
  • Additions19
  • Roofing13
  • Plumbing7
  • Demolition5
  • Accessory dwelling units2
  • HVAC2

Permit types

As the building departments classify them.

  • Building Permit83
  • EG Building Permit10
  • 1) Building Permit4
  • Roofing Permit4
  • Building Permit-All One and Two Family2
  • Building Permit - Residential (Single, 2-Family or Townhouses) Projects2
  • Window Permit2
  • Demolition Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 14, 2026Building PermitWe will be modifying existing conditioned space to add a full bathroom, as well as relocate an existing sink within existing building envelope.Warwick City$19,962
Sep 24, 2026Building PermitWe will be removing existing 3-season room on back of home and replacing with a 4-season room in a reduced footprint.Cumberland Town$55,865
Sep 20, 2026Building PermitExterior alterations to replace exterior stairs and replace garden border . If field conditions vary contact design professional prior to the start of any work.Providence City$10,066
Sep 8, 2026Building PermitThis project involves expanding existing kitchen through removal of non-load bearing wall, renovating existing main-level bathroom in same footprint, moving basEast Providence City$53,000
Aug 31, 2026Building PermitWe will be re-insulating and finishing with applied barnboard planking, half of the first level of the existing barn, as well as the sheds attached. Existing MELittle Compton Town$42,000
Aug 13, 2026Building PermitWe will be adding a 2 story addition on side of home over existing garage. Additionally, within the scope of the project includes re-roof the entire dwelling anBarrington Town$165,113
Aug 4, 2026Building PermitTwo classroom remodels, one bathroom remodel and one new bathroomProvidence City$16,955
Jul 14, 2026Building PermitWe will be adding a mudroom and primary bathroom addition to the back of the existing house. Additionally, we will be converting the existing barn into an ADU.Providence City$261,606

Permit status

Where its permits stand, as the departments report them.

  • Completed93
  • Active16
  • Finaled1
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.