Contractor · Electrical
POWERHOUND ELECTRICAL SOLUTIONS L.L.C.
112 building permits since 2023 in Stump Sound township, NC; White Oak township, NC and Richlands township, NC, across 4 counties — $239,750 in reported job value over 20 permits that state one.
- Building permits
- 112
- Reported job value
- $239.8K
- Active
- 2023–2026
- Latest permit
- Nov 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stump Sound township, NC16
- White Oak township, NC15
- Richlands township, NC13
- Jacksonville city, NC13
- Jacksonville township, NC11
- Swansboro township, NC9
- Piney Green CDP, NC8
- Pender County, NC7
- Brunswick County, NC6
- Sneads Ferry CDP, NC5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2024 | 21 |
| 2025 | 30 |
| 2026 (YTD) | 60 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators76
- Electrical73
- Gas39
- Plumbing34
- Electric meters13
- Pools & hot tubs3
- HVAC2
- EV chargers2
- New construction2
- Solar1
Permit types
As the building departments classify them.
- Residential Electrical - New51
- Residential Gas and Fuel - New30
- ELECTRICAL-HOOKUP/REPAIRS11
- Residential Electrical - Change Out4
- Residential Gas Piping Stand Alone Permit4
- Residential Electrical Stand Alone Permit3
- ELECTRICAL2
- FUEL PIPING2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 4, 2026 | ELECTRICAL-HOOKUP/REPAIRS | SCOTT CRAIG | Jacksonville City | $1,700 |
| Oct 30, 2026 | Residential Gas and Fuel - New | INSTALL 24KW GENERAC GENERATOR. GAS PIPING WILL BE STRAPPED TO EXTERIOR OF HOME FROM LP TANKS TO GENERATOR. ABOUT 35' | Stump Sound township | — |
| Oct 25, 2026 | Residential Electrical - New | install 24kw generac generator with service change. New sub panel and ATS will be installed next to meter gen feed will be ran in conduit and strapped to the ex | Stump Sound township | — |
| Oct 25, 2026 | Residential Electrical - New | INSTALL LEVEL 2 EV CHARGER | Swansboro township | — |
| Oct 12, 2026 | ELECTRICAL-HOOKUP/REPAIRS | RANDY KEEL | Jacksonville City | $14,700 |
| Oct 8, 2026 | Residential Electrical - Change Out | Interior panel change out | Sneads Ferry CDP | — |
| Oct 6, 2026 | Residential Gas and Fuel - New | INSTALL 26KW GENERAC GENERATOR. GAS PIPING WILL BE STRAPPED TO THE EXTERIOR OF HOME FROM LP TANKS TO GENERATOR ABOUT 15' | Richlands township | — |
| Sep 30, 2026 | Residential Electrical - New | INSTALL 26KW GENERAC GENEROATOR, STANDING 200 AMP SERVICE W/BACKUP TO METER & PANEL. UPGRADE MAIN FEEDER TO 4-WIRE, SEPARATE GROUNDS AND NEUTRALS; GEN FEED WILL | Richlands township | — |
Permit status
Where its permits stand, as the departments report them.
- Completed82
- Approved12
- Active6
- Issued4
- Expired4
- Void3
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.