Contractor · Demolition & excavation
Meredith Phillis
112 building permits since 2022 in Porter County, IN.
- Building permits
- 112
- Reported job value
- —
- Active
- 2022–2025
- Latest permit
- Jul 9, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Porter County, IN112
Permits by year
By issue date (application date where there is none).
02550
42
2022202320242025
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 9 |
| 2023 | 42 |
| 2024 | 38 |
| 2025 | 23 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Grading & excavation111
- Gas11
- Electrical11
- Telecom5
- Additions5
- Plumbing2
- Electric meters2
- New construction2
- Remodels1
- Demolition1
Permit types
As the building departments classify them.
- Erosion & Sediment Control/Site Improvement Permit111
- Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 9, 2025 | Erosion & Sediment Control/Site Improvement Permit | — | Porter County | — |
| Jul 7, 2025 | Erosion & Sediment Control/Site Improvement Permit | — | Porter County | — |
| May 30, 2025 | Erosion & Sediment Control/Site Improvement Permit | Regrading and Resurfacing of NIPSCOS Babcock substation to accommodate equipment upgrades. Project area presently consists of gravel resurfacing. No new impervi | Porter County | — |
| May 19, 2025 | Erosion & Sediment Control/Site Improvement Permit | Includes construction of three earthen berms. This will require removal of existing asphalt in the northeast corner of the lot. a new driveway will be construct | Porter County | — |
| May 14, 2025 | Erosion & Sediment Control/Site Improvement Permit | — | Porter County | — |
| May 13, 2025 | Erosion & Sediment Control/Site Improvement Permit | Work on select utility poles with an existing circuit to replace aerial fuses, add bird guards on transformers, reframe poles, replace guy wires, and/or total p | Porter County | — |
| Apr 22, 2025 | Erosion & Sediment Control/Site Improvement Permit | Linear installation of underground fiber optic line, connecting NIPSCO babcock, Lake George, and S. Haven Subdivisions.project will consist of underground fiber | Porter County | — |
| Apr 15, 2025 | Erosion & Sediment Control/Site Improvement Permit | — | Porter County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed109
- Void2
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.