Contractor · Electrical
devlin contracting & maintenance
113 building permits since 2015 in Ludlow town, MA; Dartmouth town, MA and Milton town, MA, across 9 counties — $1,722,541 in reported job value over 43 permits that state one.
- Building permits
- 113
- Reported job value
- $1.7M
- Active
- 2015–2026
- Latest permit
- Jun 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Ludlow town, MA36
- Dartmouth town, MA12
- Milton town, MA9
- Framingham city, MA7
- Medway town, MA6
- Derry town, NH6
- Foxborough town, MA5
- Brookline town, MA4
- West Bridgewater town, MA4
- Worcester city, MA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 2 |
| 2016 | 6 |
| 2017 | 4 |
| 2018 | 3 |
| 2019 | 7 |
| 2020 | 15 |
| 2021 | 10 |
| 2022 | 37 |
| 2023 | 12 |
| 2024 | 8 |
| 2025 | 2 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar54
- Electrical47
- Remodels9
- Battery storage5
- Additions4
- EV chargers3
- Generators2
- Roofing1
Permit types
As the building departments classify them.
- RESI.30
- ELECT.24
- Residential Building Permit20
- Res Solar6
- Electrical5
- Residential Electrical4
- Building3
- Electrical Alternate Energy Source3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 29, 2026 | ELECT. | 30 panel roof-mount solar array that ties into existing electrical system. no ess installation. 13.20 dc system | Milton Town | $17,800 |
| Jun 29, 2026 | RESI. | 30 panel roof-mount solar array that ties into existing electrical system. no ess installation. 13.20 dc system | Milton Town | $39,600 |
| Apr 11, 2025 | RESI. | add 27.0 kwh ess battery backup system to existing solar system | West Bridgewater Town | $24,750 |
| Apr 10, 2025 | ELECT. | add ess battery backup to existing solar system 27.0 kwh | West Bridgewater Town | $14,375 |
| Dec 18, 2024 | Solar | Solar - Solar | Strafford Town | — |
| Sep 19, 2024 | ELECT. | 33 panel roof-mount solar array that ties into existing electrical system. no ess installation. 14.02 dc system | West Bridgewater Town | $28,049 |
| Sep 19, 2024 | RESI. | 33 panel roof-mount solar array that ties into existing electrical system. no ess installation. 14.02 dc system | West Bridgewater Town | $60,098 |
| Aug 6, 2024 | SOLAR PANELS | 26 PANEL ROOF MOUNT SOLAR ARRAY THAT TIES INTO EXISTING ELECTRICAL SYSTEM. NO ESS, 10.92 DC SYSTEM | Salem Town | $61,780 |
Permit status
Where its permits stand, as the departments report them.
- Active33
- Completed27
- Issued21
- Closed20
- Not stated7
- Finaled4
- Void1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- DEVLIN CONTRACTING AND MAINTENANCE MATTHEW DEVLIN
- DEVLIN CONTRACTING AND MAINTENANCE DEVLIN CONTRACTING AND MAINTENANCE
- DEVLIN CONTRACTING AND MAINTENANCE INC
- DEVLIN CONSTRACTING AND MAINTENANCE
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.