Contractor · Electrical

David Bonadio

113 building permits since 2003 in Stamford town, CT; Greenwich town, CT and Bridgeport town, CT, across 2 counties — $11,611,016 in reported job value over 99 permits that state one.

Building permits
113
Reported job value
$11.6M
Active
2003–2022
Latest permit
Sep 23, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stamford town, CT94
  • Greenwich town, CT10
  • Bridgeport town, CT8
  • Ridgefield town, CT1

Permits by year

By issue date (application date where there is none).

01020
16
200320142016201820202022
View as table
YearPermits
20038
20136
201415
201511
201610
201716
201811
201915
202010
20214
20227

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical101
  • Demolition19
  • HVAC9
  • Remodels4
  • Generators3
  • Kitchens2
  • Water heaters2
  • Additions1
  • Plumbing1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical Permit88
  • ELE10
  • ARCHIVED - Electrical8
  • Fire Alarm System Permit7

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 23, 2022ELENEC. Lighting, branch power, controls, distribution, fire alarmGreenwich Town—
Aug 11, 2022ELENEC. Select electrical demo, temp power, add 2 panels, transformer, 1 feeder for petct. new lights, receptacles, mechanical branch wiring; 14 swtchs., 16 outletGreenwich Town—
Aug 5, 2022ELENEC. Select demo, new branch wiring; new lights and controls; empty Telco and Security conduits, Relocate and add fire alarm. 40 swtchs., 53 outlets, 39 lt fixtGreenwich Town—
Jul 15, 2022ELENEC. Lighting, branch power, controlsGreenwich Town—
Jun 10, 2022ELE1 Greenwich Plaza/Bldg 1, 2nd floor : demo all electrical work, temp. lighting, 1 panel and transformer . NEC.Greenwich Town—
Apr 19, 2022ELENEC. Lighting, branch power, controls, distribution, fire alarm. Tenant fit-out Building #2 on 3rd floor. Tenant: i Capital NetworkGreenwich Town—
Feb 17, 2022ELENEC; lighting, demoGreenwich Town—
Dec 29, 2021ELEInstallation of EVSE-1 panel and Site-C panel - Building C.Greenwich Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed55
  • Active50
  • Issued8

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.