Contractor · Electrical

COUPER ELECTRIC LLC

114 building permits since 2005 in Boulder city, CO; Boulder County, CO and Broomfield County, CO, across 3 counties — $479,627 in reported job value over 106 permits that state one.

Building permits
114
Reported job value
$479.6K
Active
2005–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO94
  • Boulder County, CO15
  • Broomfield County, CO3
  • Northglenn city, CO1
  • Thornton city, CO1

Permits by year

By issue date (application date where there is none).

01020
16
20052008201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20051
20064
20074
200814
20095
20101
20113
20122
20133
20145
20152
20162
20175
20187
20195
20201
20214
20221
202316
20247
20258
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical106
  • HVAC14
  • Remodels14
  • Kitchens12
  • Electric meters11
  • Plumbing8
  • EV chargers7
  • Heat pumps6
  • Gas4
  • Additions4

Permit types

As the building departments classify them.

  • Electrical Permit80
  • Mechanical Permit9
  • Electrical Service Change4
  • B-Add/Alt Electric Service Change2
  • Commercial Electric2
  • Electrical Lift Station2
  • Plumbing Permit2
  • Sign Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026Electrical PermitInstall new hardwired EV charger set with installer pin to 40a max fed from 50a GFCI breaker installed in panel in unit and fed with 6/3NM fished though soffit Boulder$1,250
Oct 22, 2026Electrical PermitInstall Hardwired EV charger in carport set to 24a max with installer pin and install a 30a GFCI breaker on interior panelBoulder$1,365
Oct 9, 2026Mechanical PermitRemoval of AC Condensers and upgrade to Mitsubishi Multi-Zone Heat Pump Mini-Split System. Electrical upgrades to be done by Couper Electrical. **PLEASE NOTE: ABoulder$13,759
Oct 7, 2026GeneratorGeneratorBoulder County$12,000
Oct 1, 2026Electrical PermitReplace 125a panel to 200a panel. Replace meter with 200a rated meter with bypass handle. Install new riser and conductors to connect to overhead. Install new gBoulder$6,000
Oct 1, 2026Mechanical PermitInstalling 10 Zone Mitsubishi Mini Split 1-MXZ-SM60NLHZ-U1 62K BTU COOLING, 58K BTU HEATING HEAT PUMP 1-MXZ-3D30NLHZ 31K BTU COOLING, 21K BTU HEATING HEAT PUMP Boulder$69,475
Sep 25, 2026Mechanical PermitMini split installation Installing: 1-MXZ-SM60NLHZ-U1 62K BUT COOLING, 58K BTU HEATING 20SEER 2 HEAT PUMP 3-MSZ-GX12NL WALL MOUNT **PLEASE NOTE: APPLICABLE ONLYBoulder$51,778
Sep 16, 2026Mechanical PermitInstalling: 1-BOHA-36MTB-M18S 34K BTU 18SEER2 BOSCH HEAT PUMP 1-BGH97M080B3A TWO STAGE BOSCH GAS FURNACE 80K 96% 1-BMAC3036BBTA CASED COIL 1-LEVEL 1 ELECTRICAL Boulder$24,713

Permit status

Where its permits stand, as the departments report them.

  • Completed81
  • Void8
  • Closed8
  • Issued8
  • Not stated3
  • Reviews in progress2
  • Active1
  • Finaled1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • COUPER ELECTRIC LTD
  • COUPER ELECTRIC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.