Contractor · HVAC
Radames Colon
115 building permits since 2015 in Lexington town, MA; Natick town, MA and Somerville city, MA, across 4 counties — $2,948,685 in reported job value over 102 permits that state one.
- Building permits
- 115
- Reported job value
- $2.9M
- Active
- 2015–2026
- Latest permit
- Sep 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lexington town, MA26
- Natick town, MA16
- Somerville city, MA16
- Concord town, MA9
- Methuen city, MA8
- Haverhill city, MA7
- Gloucester city, MA4
- Amesbury city, MA3
- Andover town, MA3
- Tewksbury town, MA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 2 |
| 2017 | 7 |
| 2018 | 2 |
| 2019 | 1 |
| 2020 | 3 |
| 2021 | 6 |
| 2022 | 5 |
| 2023 | 16 |
| 2024 | 21 |
| 2025 | 25 |
| 2026 (YTD) | 26 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC97
- Heat pumps47
- Bathrooms29
- Kitchens23
- Gas15
- New construction6
- Additions4
- Electrical4
- Remodels3
- Accessory dwelling units1
Permit types
As the building departments classify them.
- Sheet Metal22
- Building Permit - Sheet Metal16
- Mechanical Permit12
- SHT MTL11
- Sheet Metal Permit8
- Sheet Metal Permit / Mechanical Permit (use for mini-splits)8
- Building Permit4
- Mechanical4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 30, 2026 | Mechanical Permit | INSTALLING NEW HEATING AND AC SYSTEM WITH ALL NEW SHEET METAL. SYSTEM WILL BE GAS FIRED BY PROPANE WITH HEAT PUMP, DUAL FULE SYSTEM. UNIT WILL BE INSTALLED IN B | Haverhill City | $26,000 |
| Sep 3, 2026 | Mechanical Permit Application | INSTALLING 2 BOSCH ELECTRIC HEAT PUMPS SYSTEMS WITH ALL NEW SHEET METAL FOR HOME. ONE UNIT WILL BE INSTALLED IN ATTIC FOR 2ND FLOOR OF HOME. ONE UNIT WILL BE IN | Arlington Town | $50,000 |
| Aug 4, 2026 | Mechanical Permit | NEW CONSTRUCTION HOUSE, INSTALL NEW HVAC WITH SHEET METAL | Haverhill City | $27,500 |
| Jul 31, 2026 | Sheet Metal Permit | INSTALLING 2 HEATING AND AC SYSTEMS WITH ALL NEW SHEET METAL. ONE UNIT WILL BE INSTALLED IN ATTIC FOR THE 2ND FLOOR OF HOME. ONE UNIT WILL BE INSTALLED IN BASEM | Bolton Town | $45,000 |
| Jul 30, 2026 | Mechanical Permit | NEW CONSTRUCTION, INSTALLING NEW BOSCH DUEL FULE SYSTEM WITH ALL NEW SHEET METAL | Haverhill City | $27,000 |
| Jul 21, 2026 | Sheet Metal | INSTALLING 2 BOSCH HEAT PUMP SYSTEMS WITH ALL NEW SHEET METAL. 2 ERV SYSTEMS. ALL EXHAUST FOR BATHS, DRYER AND KITCHEN | Lexington Town | $45,000 |
| Jul 13, 2026 | Building Permit - Sheet Metal | new furnace and sheet metal for new addtion. new furnace and sheet metal for 2nd floor of home | Natick Town | $29,000 |
| Jul 2, 2026 | Sheet Metal | INSTALLING 2 NEW BOSCH HEAT PUMP SYSTEMS WITH ALL NEW SHEET METAL. INSTALLING 2 ERV SYSTEMS. ALL EXHAUST | Lexington Town | $40,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed58
- Active30
- Issued16
- Closed4
- Finaled3
- Cancelled3
- Withdrawn1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.