Contractor · Roofing

Landon W Roberts Construction

115 building permits since 2016 in Citrus Heights city, CA; Sacramento city, CA and Sacramento County, CA — $1,931,153 in reported job value over 115 permits that state one.

Building permits
115
Reported job value
$1.9M
Active
2016–2026
Latest permit
May 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus Heights city, CA62
  • Sacramento city, CA28
  • Sacramento County, CA25

Permits by year

By issue date (application date where there is none).

012.525
24
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20169
201817
20191
202018
202124
20221
20237
20241
202521
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing3
  • Plumbing1
  • Electrical1
  • New construction1

Permit types

As the building departments classify them.

  • Deck/Stairs38
  • Apts 5+25
  • CBRC18
  • Siding/Stucco18
  • Dryrot Repair6
  • CBNC3
  • Condos3
  • APPR2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 29, 2026CBNC(MAIN CASE) replacing like for like joists beneath porch/balconySacramento County$10,000
May 29, 2026CBNC(SUB CASE FOR CBNC2026-00087) replacing like for like joists beneath porch/balconySacramento County$10,000
May 29, 2026CBNC(SUB CASE FOR CBNC2026-00087) replacing like for like joists beneath porch/balconySacramento County$10,000
Apr 30, 2026Apts 5+EPC -9 SHARED PLANS- Units 248-249-250-251 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578Sacramento$3,200
Apr 30, 2026Apts 5+EPC -9 SHARED PLANS- Units 236-238-239 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 23Sacramento$24,200
Apr 30, 2026Apts 5+EPC -9 SHARED PLANS- Units 245-246-247 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 24Sacramento$24,200
Apr 30, 2026Apts 5+EPC -9 SHARED PLANS- Units 215-216-217-218 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. UnitSacramento$31,200
Apr 30, 2026Apts 5+EPC -9 SHARED PLANS -Units 223-224-225-227 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. UnitSacramento$32,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled61
  • Issued32
  • Completed14
  • Cancelled5
  • Closed3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.