Contractor · General building
TELCO CONST (GNC)
117 building permits since 2001 in Buffalo city, NY — $55,916,537 in reported job value over 112 permits that state one.
- Building permits
- 117
- Reported job value
- $55.9M
- Active
- 2001–2025
- Latest permit
- Dec 1, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY117
Permits by year
By issue date (application date where there is none).
0510
10
20022005200820112014201720202025
View as tableHide table
| Year | Permits |
|---|---|
| 2001 | 9 |
| 2002 | 8 |
| 2003 | 4 |
| 2004 | 6 |
| 2005 | 9 |
| 2006 | 10 |
| 2007 | 9 |
| 2008 | 5 |
| 2009 | 4 |
| 2010 | 2 |
| 2011 | 3 |
| 2012 | 2 |
| 2013 | 3 |
| 2014 | 5 |
| 2015 | 5 |
| 2016 | 1 |
| 2017 | 6 |
| 2018 | 5 |
| 2019 | 6 |
| 2020 | 3 |
| 2021 | 4 |
| 2024 | 5 |
| 2025 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels67
- Roofing9
- Additions7
- Plumbing7
- Windows & doors5
- HVAC4
- Electrical4
- Bathrooms3
- Kitchens2
- Demolition2
Permit types
As the building departments classify them.
- GC71
- REPAIR36
- TEAROUT6
- NEW COM2
- INTBLDOUT1
- NEW RESI1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 1, 2025 | INTBLDOUT | Remove of existing surgical equipment, relocation of support equipment. *** Digeplan *** | Buffalo City | $350,000 |
| May 6, 2025 | GC | Selectively remove roofing to attached new steel posts to existing steel members. Attached dunnage extension and patch roofing.<div><br></div><div>*** DIGEPLAN | Buffalo City | $50,000 |
| Apr 3, 2025 | GC | Electrical replacements, painting, and wall repairs at lobbies. Ramp guardrail repairs and expansion joint cover replacements. *** A SEPARATE PERMIT IS REQUIRED | Buffalo City | $150,000 |
| Oct 11, 2024 | GC | Renovation of existing SPD and basement storage area, includes new areaways for intake/exhaust, updating soiled elevator, and updating fire pump. *** TEAR-OUT T | Buffalo City | $1,957,000 |
| Aug 26, 2024 | GC | Interior renovation of existing Cath Labs 6 thru 9 includes structural, concrete, interior finishes and MEP. *** INTERIOR TEAR-OUT / ASBESTOS ABATEMENT TO BE CO | Buffalo City | $1,550,000 |
| Aug 22, 2024 | TEAROUT | Renovation of existing Cath Labs 6, 7, 8, and 9 work to include selective demolition, asbestos abatement, structural steel, helical piles, concrete, interior fi | Buffalo City | $35,000 |
| Mar 15, 2024 | GC | CATHOLIC HEALTH MERCY HOSPITAL OF BUFFALO - CATH LAB 5 REPLACEMENT.<div>*** PLANS FILED THROUGH IDT *** </div><div><br></div><div>*** ATTACHED ASBESTOS SUR | Buffalo City | $350,000 |
| Jan 29, 2024 | GC | CATHOLIC HEALTH MERCY HOSPITAL OF BUFFALO - 3RD FLOOR INTERIOR BUILD-OUT FOR FRESHENS FRESH FOOD KITCHEN FRANCHISE.<div>*** PLANS FILED THROUGH IDT *** &n | Buffalo City | $150,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.