Contractor · Windows, doors & glazing
lawrence o'connor
117 building permits since 2016 in Falmouth town, MA; Bourne town, MA and Barnstable Town city, MA, across 2 counties — $988,768 in reported job value over 15 permits that state one.
- Building permits
- 117
- Reported job value
- $988.8K
- Active
- 2016–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA101
- Bourne town, MA10
- Barnstable Town city, MA4
- Sandwich town, MA1
- Wareham town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 1 |
| 2018 | 2 |
| 2020 | 6 |
| 2021 | 2 |
| 2022 | 17 |
| 2023 | 19 |
| 2024 | 25 |
| 2025 | 23 |
| 2026 (YTD) | 22 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Windows & doors46
- Roofing36
- Additions13
- Kitchens11
- Solar6
- Bathrooms4
- Remodels2
- Demolition2
- New construction2
Permit types
As the building departments classify them.
- REP73
- RESI.29
- Building- Express Permit RESIDENTIAL ONLY( Roof, siding, windows/doors, solar, insulation/weatherization, temp storage, fence ov6
- Building Permit5
- Expedited Building Permit - Commercial3
- Expedited Building Permit - Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Building- Express Permit RESIDENTIAL ONLY( Roof, siding, windows/doors, solar, insulation/weatherization, temp storage, fence ov | Strip existing cedar shakes, replace with 2sq new cedar shakes. | Bourne Town | $2,800 |
| Oct 1, 2026 | RESI. | remove decking and railings. replace decking and railings with azek composite decking and "transform" system railings. no changes to framing or structure, no ch | Falmouth Town | — |
| Sep 24, 2026 | RESI. | remove existing kitchen cabinets and countertops, replace with new j&k cabinets and countertops. replace one picture window with no header change. | Falmouth Town | — |
| Sep 18, 2026 | REP | remove six windows and replace with new anderson 400 series windows. | Falmouth Town | — |
| Sep 17, 2026 | REP | replace front bay window with harvey 3 wide double hung, no header change. replace front entry door with thermatru entry door no header change. replace existing | Falmouth Town | — |
| Sep 17, 2026 | REP | remove existing picture window. install new harvey classic double hung complete unit picture window. | Falmouth Town | — |
| Sep 16, 2026 | REP | remove existing decking and railings. replace decking with new azek composite decking, replace railing with new azek "transform" railing. no changes to the exis | Falmouth Town | — |
| Sep 3, 2026 | REP | replace two existing windows with anderson double hung replacement windows, no framing changes. | Falmouth Town | — |
Permit status
Where its permits stand, as the departments report them.
- Issued73
- Closed23
- Active11
- Completed4
- Withdrawn4
- Cancelled1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.