117 building permits since 2016 in Wellesley town, MA; Sutton town, MA and Dudley town, MA, across 7 counties — $1,514,866 in reported job value over 108 permits that state one.
- Building permits
- 117
- Reported job value
- $1.5M
- Active
- 2016–2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Wellesley town, MA22
- Sutton town, MA19
- Dudley town, MA15
- Arlington town, MA10
- Rutland town, MA6
- Peabody city, MA4
- Lexington town, MA4
- Webster town, MA3
- Acton town, MA2
- Somerville city, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 1 |
| 2017 | 2 |
| 2018 | 1 |
| 2019 | 3 |
| 2020 | 3 |
| 2022 | 9 |
| 2023 | 14 |
| 2024 | 15 |
| 2025 | 34 |
| 2026 (YTD) | 35 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC62
- Plumbing44
- Remodels34
- Heat pumps31
- Bathrooms26
- Kitchens23
- Additions18
- Gas13
- Electrical3
- Accessory dwelling units1
Permit types
As the building departments classify them.
- Plumbing Permit44
- Sheet Metal Permit25
- Mechanical Permit8
- Mechanical Permit Application5
- Sheet Metal Permit **(EXISTING ductwork modification ONLY)**5
- Mechanical / Sheet Metal Permit Application4
- SHT MTL3
- Building Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | Sheet Metal Permit **(EXISTING ductwork modification ONLY)** | Add new zone to the new addition | Arlington Town | $8,000 |
| Oct 1, 2026 | Mechanical Permit Application | Installation of two 2 ton hydronic heat pump systems with new ductwork. | Arlington Town | $18,000 |
| Sep 24, 2026 | Sheet Metal/Mechanical Permit | Install one 3-ton (36,000 BTU) Heat pump With one 3-ton air handler and new supply and return ductwork, and one kitchen exhaust hood up to 400 CFM | Stoneham Town | $8,000 |
| Sep 14, 2026 | Sheet Metal Permit | Install three bathroom exhaust vent and one laundry exhaust vent. | Wellesley Town | $2,000 |
| Sep 11, 2026 | Sheet Metal Permit | Remove existing air handler and install one new hydronic air handler with one 4-ton heat pump condenser. | Wellesley Town | $10,000 |
| Sep 11, 2026 | Sheet Metal Permit | Install two hydronic air handlers with two 3-ton heat pump condensers, ductwork for two HVAC zones, one kitchen hood vent up to 400 CFM, two bathroom exhaust ve | Wellesley Town | $20,000 |
| Sep 10, 2026 | Mechanical Permit | Provide (2) Heat pumps Provide (2) Air Handlers install 2 units one for the first floor one for the second floor | Winthrop Town City | $14,000 |
| Sep 4, 2026 | Mechanical/Sheet Metal Permit | Install central Air system for the first floor and basement and install 2 Mini split system fort the second floor | Bourne Town | $35,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed69
- Active42
- Closed3
- Finaled2
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.