Contractor · Electrical
Michael Johnson
119 building permits since 2008 in Gloucester city, MA; Boston city, MA and Newburyport city, MA, across 11 counties — $11,078,375 in reported job value over 97 permits that state one.
- Building permits
- 119
- Reported job value
- $11.1M
- Active
- 2008–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gloucester city, MA51
- Boston city, MA14
- Newburyport city, MA8
- Franklin Town city, MA6
- Kittery town, ME5
- Manchester-by-the-Sea town, MA4
- Westerly town, RI4
- Beverly city, MA3
- Braintree Town city, MA3
- Barnstable Town city, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2008 | 1 |
| 2010 | 5 |
| 2011 | 4 |
| 2012 | 3 |
| 2014 | 3 |
| 2016 | 1 |
| 2017 | 7 |
| 2018 | 7 |
| 2019 | 5 |
| 2020 | 5 |
| 2021 | 13 |
| 2022 | 8 |
| 2023 | 13 |
| 2024 | 21 |
| 2025 | 6 |
| 2026 (YTD) | 16 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical88
- Remodels18
- New construction15
- HVAC14
- Kitchens11
- Additions9
- Bathrooms9
- Generators7
- Heat pumps7
- Electric meters7
Permit types
As the building departments classify them.
- Electrical Permit74
- FA8
- Building Permit7
- Franklin Electrical Permit6
- EXTREN4
- ELECT.3
- Mechanical Permit3
- Cut and Weld/Hot Works Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Electrical Permit | 2nd floor bedroom and bathroom renovation. T wo new circuits for the bathroom, which will be arc fault protected. A dedicated 20 amp plug circuit will be provid | Newburyport City | $5,000 |
| Oct 7, 2026 | Electrical Permit | Service Upgrade from 100 Amps to 200 amps | Newburyport City | $5,000 |
| Oct 5, 2026 | Cut and Weld/Hot Works Permit | Welding and Grinding to install new stair structures in the CMU shafts. New construction and we will be in the CMU shafts welding only. | Plymouth Town | — |
| Oct 5, 2026 | Cut and Weld/Hot Works Permit | Torch cutting hole through two beams for pipe penetrations | Plymouth Town | — |
| Aug 24, 2026 | Building Permit | — | South Kingstown Town | — |
| Aug 6, 2026 | Electrical Permit | EV Charger in garage | Newburyport City | $1,500 |
| Aug 4, 2026 | Electrical Permit | 20 Amp dedicated plug to the shed with undergorund conduit. | Amesbury City | $3,000 |
| Jul 21, 2026 | Electrical Permit | Service upgrade from 100 amps to 200 amps. Overhead service with meter and electrical panel to be in the same location. None of the exisitng branch circutis wil | Gloucester City | $5,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed58
- Active43
- Stop work ordered6
- Closed4
- Issued4
- Expired1
- Pending1
- Revoked1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.