Contractor · Specialty (solar, fire, telecom)

SOLFARM SOLAR CO.; SOLFARM SOLAR CO

122 building permits since 2016 in Asheville city, NC and Henderson County, NC, across 2 counties — $3,109,604 in reported job value over 115 permits that state one.

Building permits
122
Reported job value
$3.1M
Active
2016–2025
Latest permit
Jun 5, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Asheville city, NC117
  • Henderson County, NC5

Permits by year

By issue date (application date where there is none).

01530
26
20172019202120232025
View as table
YearPermits
20161
20173
201815
201926
202022
202121
202215
20237
20249
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar120
  • Electrical26
  • Roofing14
  • Battery storage9
  • Electric meters8
  • Additions5
  • EV chargers3
  • New construction1

Permit types

As the building departments classify them.

  • Res: Solar Array105
  • Com: Solar Array9
  • Residential - Solar Panels3
  • Com: Other2
  • Sub-Electrical (Residential/Commercial)2
  • Res: Retaining Wall1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 5, 2025Res: Solar ArrayROOF MOUNTED SOLAR ELECTRIC SYSTEM FOR ROBERT KANE.Asheville$15,515
Mar 10, 2025Res: Solar ArrayINSTALLATION OF (17) SOLAR PANELS ON THE ROOF AND (1) INVERTER NEAR SERVICE ENTRANCE FOR WILLIAM GERTZ.Asheville$2,000
Dec 12, 2024Com: Solar ArrayINSTALLATION OF GRIED TIED SOLAR ARRAY ON ROOF;TIE IN METER THROUGH BASEMENT PANEL;REF 22-05463 MAIN BLDG;MASTER SITE 22-01191PZAsheville$30,654
Aug 26, 2024Res: Solar ArrayINSTALLATION OF A ROOF MOUNTED SOLAR ELECTRIC SYSTEM AND A BACKUP BATTERY. THE POINT OF INTERCONNECTION WILL BE ON THE BUS BAR OF THE HOME’S MAIN PANEL ON THE LAsheville$31,026
Jun 27, 2024Res: Solar ArrayROOF MOUNTED SOLAR WITH BATTERY BACKUP FOR GARY RENNICKAsheville$31,890
May 29, 2024Com: OtherGIVENS SOLAR EV CHARGERS Top of pole mount solar electric system that will be interconnected at a standalone meter/main service. There will also be 4 electric vAsheville$49,981
May 29, 2024Com: OtherGIVENS SOLAR EV CHARGERS Top of pole mount solar electric system that will be interconnected at a standalone meter/main service. There will also be 4 electric vAsheville$49,981
May 9, 2024Residential - Solar Panels—Henderson County—

Permit status

Where its permits stand, as the departments report them.

  • Issued99
  • Expired16
  • Closed7

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.