Contractor · Electrical

Ross Landy

122 building permits since 2017 in Middletown town, RI; Newport city, RI and Tiverton town, RI, across 4 counties — $332,460 in reported job value over 120 permits that state one.

Building permits
122
Reported job value
$332.5K
Active
2017–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Middletown town, RI43
  • Newport city, RI43
  • Tiverton town, RI13
  • Portsmouth town, RI10
  • Bristol town, RI8
  • Dartmouth town, MA1
  • Barrington town, RI1
  • Little Compton town, RI1
  • New Shoreham town, RI1
  • North Kingstown town, RI1

Permits by year

By issue date (application date where there is none).

012.525
22
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20172
201811
20198
20208
202122
202216
20239
202411
202514
2026 (YTD)21

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical122
  • HVAC23
  • Kitchens23
  • Bathrooms23
  • Electric meters20
  • Remodels14
  • Heat pumps12
  • Pools & hot tubs12
  • Generators8
  • Additions6

Permit types

As the building departments classify them.

  • Electrical Permit122

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026Electrical Permitwire existing generator 18 kw with generator prefabbed cord. tie into existing transfer switch. run tstat wire to AC condensor for load manegement relayPortsmouth Town$1,950
Oct 13, 2026Electrical Permit1) Replaced meter-base and panel. Kept at 100amp . New ground rods, bonding , CATV bridge. Riser up pole 1.25" schedulae 80 first 10' #1 THWM aluminum in conduiPortsmouth Town$3,100
Sep 28, 2026Electrical PermitInstall two circuit to new septic controller. Wire air pump pit and septic pump and floats in second pitTiverton Town$790
Sep 1, 2026Electrical Permitinstall a 50amp circuit from panel Unit #2 with SER cable to outside Spa disconnect (GFCI) and then PVC under deck to hot tub. #6 thwn from disconnect to tub.Middletown Town$1,900
Aug 13, 2026Electrical PermitConversion of a laundry room into a bathroom. Laundry room moving over to a stack unit in a closet. Adding one 20amp circuit /gfci for the bathroom and a fan/liMiddletown Town$2,500
Aug 13, 2026Electrical PermitInstall a 20amp and a 15 amp circuit from the main panel in the basement to the new septic controller. Tie in circuits and label panel. Pull in pump and controlPortsmouth Town$950
Jul 2, 2026Electrical PermitInsatll a new equipotential bond system around pool, picking up any metal brackets, pool pump, water bond ground lug, and main feeder bond. Note , above ground Portsmouth Town$400
Jun 25, 2026Electrical PermitInstall a 50amp feeder and mount a sub panel in the garage for (two) 30amp Car charger EV receptacles below sub panel. (Tesla adaptors limit the draw to 22 ampsPortsmouth Town$1,750

Permit status

Where its permits stand, as the departments report them.

  • Completed83
  • Active39

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.