Contractor · Plumbing
RJM CONTRACTING & PLUMBING
122 building permits since 2013 in Buffalo city, NY — $3,116,057 in reported job value over 105 permits that state one.
- Building permits
- 122
- Reported job value
- $3.1M
- Active
- 2013–2026
- Latest permit
- Aug 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY122
Permits by year
By issue date (application date where there is none).
03060
59
20142017202020232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2014 | 7 |
| 2015 | 8 |
| 2016 | 7 |
| 2017 | 3 |
| 2018 | 2 |
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 9 |
| 2022 | 5 |
| 2023 | 6 |
| 2024 | 5 |
| 2025 | 59 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing122
- Bathrooms26
- Kitchens11
- Gas6
- Grading & excavation5
- Remodels5
- HVAC4
- Electrical4
- Additions3
- Demolition3
Permit types
As the building departments classify them.
- PLUMBING113
- PLUMB-GC9
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 20, 2026 | PLUMBING | Install new catch basin and drainage into existing sewer. 1 catch basin 40ft of 6"underground pipe | Buffalo City | $50,000 |
| Jun 30, 2026 | PLUMBING | • Provide layout • All saw cut, bust and removal of concrete done by other • All excavation and exposure of existing pipe to be done by other • Cut into existin | Buffalo City | $82,500 |
| Jun 22, 2026 | PLUMBING | Saw cut bust and remove floor for new plumbing layout. | Buffalo City | $175,000 |
| Jun 18, 2026 | PLUMBING | Sawcut bust and remove concrete and excavate for installation of new interior sanitary sewer system, Tie onto existing water install new gas lines PVC DWV lines | Buffalo City | $125,000 |
| May 4, 2026 | PLUMBING | Gas line for pool heater from meter to heater 60' trench 18" deep back yard | Buffalo City | $2,000 |
| Apr 16, 2026 | PLUMBING | Tie onto existing 3" riser for new PVC waste lines, revent 2nd floor sink, tie onto existing water for new uponore waterlines | Buffalo City | $6,500 |
| Apr 9, 2026 | PLUMBING | tie onto existing plumbing in basement for new barksinks, ice bins and kitchen sinks. install uponore waterlines. | Buffalo City | $6,500 |
| Dec 26, 2025 | PLUMBING | Tie onto existing plumbing stubbed out of ground and install PVC and uponore waterlines | Buffalo City | $10,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.