Contractor · Plumbing
thomas mcdonough
124 building permits since 2009 in Milton town, MA; Quincy city, MA and Boston city, MA, across 3 counties — $350,944 in reported job value over 81 permits that state one.
- Building permits
- 124
- Reported job value
- $350.9K
- Active
- 2009–2026
- Latest permit
- May 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Milton town, MA86
- Quincy city, MA13
- Boston city, MA13
- Braintree Town city, MA6
- Randolph Town city, MA3
- Dedham town, MA2
- North Andover town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2009 | 2 |
| 2010 | 3 |
| 2011 | 6 |
| 2012 | 3 |
| 2013 | 11 |
| 2014 | 3 |
| 2015 | 9 |
| 2016 | 8 |
| 2017 | 4 |
| 2018 | 10 |
| 2019 | 7 |
| 2020 | 18 |
| 2021 | 12 |
| 2022 | 8 |
| 2023 | 11 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing92
- Gas40
- Bathrooms17
- HVAC9
- Kitchens9
- Remodels8
- Water heaters2
- Generators1
- Electrical1
- Electric meters1
Permit types
As the building departments classify them.
- PLUMB.64
- GAS37
- Plumbing Permit12
- PLUMBING7
- Gas Permit2
- *Electrical Permit1
- Gas Fitter Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 19, 2026 | PLUMB. | underground, rough and finish plumbing for above fixtures | Milton Town | $3,900 |
| Feb 27, 2026 | Plumbing Permit | Remove tub drain and change it to a shower drain. Convert tub and shower valve to shower only. | Quincy City | $2,500 |
| Nov 21, 2025 | PLUMB. | rough and finish plumbing for above fixtures | Milton Town | $5,000 |
| Jun 2, 2025 | Plumbing Permit | Replace existing water closet, lav, and tub with new, in same location. | Quincy City | — |
| Jan 28, 2025 | PLUMB. | rough and finish plumbing for above fixtutes | Randolph Town City | $5,000 |
| Dec 18, 2024 | PLUMB. | rough and finish for above fixtures | Milton Town | $5,000 |
| Sep 16, 2024 | PLUMB. | rough and finish plumbing for 2nd floor bathroom and replacing fixtures in 1st floor 1/2 bath. | Milton Town | $6,000 |
| Jun 14, 2024 | PLUMB. | 2nd meter connection | Milton Town | $1,500 |
Permit status
Where its permits stand, as the departments report them.
- Finaled59
- Issued28
- Completed16
- Closed14
- Active6
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.