Contractor · Specialty (solar, fire, telecom)

empwr solar llc

125 building permits since 2025 in Haverhill city, MA; Stoughton town, MA and Quincy city, MA, across 9 counties — $2,433,034 in reported job value over 111 permits that state one.

Building permits
125
Reported job value
$2.4M
Active
2025–2026
Latest permit
Oct 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Haverhill city, MA14
  • Stoughton town, MA12
  • Quincy city, MA9
  • Randolph Town city, MA8
  • Methuen city, MA6
  • Everett city, MA6
  • Bridgewater Town city, MA6
  • Dartmouth town, MA4
  • Springfield city, MA4
  • Abington town, MA4

Permits by year

By issue date (application date where there is none).

04080
75
20252026*
* 2026 is year to date.
View as table
YearPermits
202550
2026 (YTD)75

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar116
  • Electrical77
  • Electric meters15
  • Remodels7
  • HVAC2
  • Battery storage1

Permit types

As the building departments classify them.

  • Electrical Permit27
  • ELECT.22
  • RESI.11
  • Building Permit8
  • Building Permit Application7
  • Building Permit: RESIDENTIAL Renovate or Remodel7
  • Electrical Permit - RESIDENTIAL ONLY7
  • BUILD6

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2026RESI.4.35 KW DC & 3.84 KW AC GRID TIED PHOTOVOLTAIC SYSTEMBridgewater Town City$31,984
Oct 20, 2026ELECT.4.35 KW DC & 3.84 KW AC GRID TIED PHOTOVOLTAIC SYSTEMBridgewater Town City$31,984
Oct 5, 2026ELECT.7.83 kw dc & 6.84 kw ac grid tied photovoltaic systemHanson Town$18,401
Sep 22, 2026Wiring PermitSolarBrewster Town$26,510
Sep 21, 2026Building Permit15.05 KW DC & 13.30 KW AC GRID TIED PHOTOVOLTAIC SYSTEM WITH A NEW 200A MAIN BREAKER ENCLOSURE TO BE INSTALLED FOR LINE SIDE TAPBrewster Town$26,510
Sep 17, 2026Building Permit Application - One & Two Family4.35 KW DC & 3.80 KW AC GRID TIED PHOTOVOLTAIC SYSTEMSpringfield City$11,549
Sep 17, 2026Building Permit Application - One & Two Family6.53 KW DC & 5.70 KW AC GRID TIED PHOTOVOLTAIC SYSTEMSpringfield City$20,032
Sep 17, 2026RESI.7.83 kw dc & 6.84 kw ac grid tied photovoltaic systemHanson Town$18,401

Permit status

Where its permits stand, as the departments report them.

  • Completed43
  • Active42
  • Issued29
  • Stop work ordered4
  • Finaled3
  • Closed2
  • Cancelled1
  • Withdrawn1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.