Contractor · Electrical

adam Marcaccio

126 building permits since 2024 in Warwick city, RI; Bristol town, RI and Smithfield town, RI, across 5 counties — $1,062,902 in reported job value over 110 permits that state one.

Building permits
126
Reported job value
$1.1M
Active
2024–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Warwick city, RI22
  • Bristol town, RI13
  • Smithfield town, RI9
  • West Warwick town, RI8
  • Scituate town, RI8
  • Burrillville town, RI7
  • South Kingstown town, RI7
  • Johnston town, RI6
  • Cranston city, RI5
  • East Greenwich town, RI4

Permits by year

By issue date (application date where there is none).

04080
61
202420252026*
* 2026 is year to date.
View as table
YearPermits
202411
202561
2026 (YTD)54

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical125
  • New construction56
  • Kitchens6
  • HVAC5
  • Remodels5
  • Bathrooms5
  • Electric meters5
  • Additions4
  • Generators4
  • Accessory dwelling units3

Permit types

As the building departments classify them.

  • Electrical Permit116
  • 2) Electrical Permit5
  • EG Electrical Permit4
  • Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026Electrical Permitwire finished basement to codeSmithfield Town$5,000
Oct 29, 2026Electrical PermitWire new addition to codeGlocester Town$3,500
Oct 23, 2026Electrical Permit—South Kingstown Town—
Oct 19, 2026Electrical Permitwire new home to code; install underground 200amp service.Glocester Town$13,000
Oct 16, 2026Electrical Permitinspection of wiring for heat pump system that was wired/installed by general contractor. permit is being submitted to document existing installation by othersWarwick City$1,000
Oct 13, 2026Electrical Permitupgrade existing service to 200ampNorth Providence Town$4,000
Oct 8, 2026Electrical PermitAdd new lights and receptacles for new walls added by contractor.East Providence City$900
Oct 7, 2026Electrical Permitwire new furnace,add basement lights,wire ac condenser,change receptacles,switches and light fixturesWarwick City$2,500

Permit status

Where its permits stand, as the departments report them.

  • Completed76
  • Active50

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.