Contractor · Specialty (solar, fire, telecom)
Verizon Wireless
127 building permits since 2012 in Orleans Parish, LA and East Baton Rouge Parish, LA, across 2 counties — $20,000 in reported job value over 1 permits that state one.
- Building permits
- 127
- Reported job value
- $20K
- Active
- 2012–2024
- Latest permit
- May 24, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA126
- East Baton Rouge Parish, LA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 6 |
| 2013 | 2 |
| 2014 | 4 |
| 2015 | 15 |
| 2016 | 1 |
| 2017 | 2 |
| 2019 | 80 |
| 2020 | 4 |
| 2021 | 1 |
| 2022 | 5 |
| 2023 | 4 |
| 2024 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Telecom39
- Remodels12
- Electrical10
- Generators4
- Additions2
- HVAC1
Permit types
As the building departments classify them.
- Renovation (Non-Structural)12
- Existing Cell Tower1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 24, 2024 | Renovation (Non-Structural) | Upgrading equipment inside the existing telecommunications shelter. No structural changes or additional electrical work needed. | Orleans Parish | — |
| Apr 29, 2024 | — | update meter at tower (90°5'21.423"W, 29°57'30.482"N) Change 2429 Perdido St to 2431 Perdido St A (AM11365679) | Orleans Parish | — |
| Mar 7, 2024 | Renovation (Non-Structural) | Upgrading equipment inside the existing telecommunications shelter. No structural changes or additional electrical work needed. | Orleans Parish | — |
| Oct 16, 2023 | Existing Cell Tower | THE PURPOSE OF THIS PROJECT IS TO ENHANCE BROADBANDCONNECTIVITY AND CAPACITY TO THE EXISTING ELIGIBLEWIRELESS FACILITY. REMOVE AND REPLACE ANTENNA ON EXISTING T | East Baton Rouge Parish | $20,000 |
| Jul 24, 2023 | Renovation (Non-Structural) | Placing 2 2' microwaves on Verizon owned shelter within compound of existing cell tower. No structural changes or additional electrical work needed. | Orleans Parish | — |
| Jul 24, 2023 | Renovation (Non-Structural) | Placing 2 2' microwaves on Verizon owned shelter within compound of existing cell tower. No structural changes or additional electrical work needed. | Orleans Parish | — |
| Jan 30, 2023 | Renovation (Non-Structural) | Placing 2 2' microwaves on Verizon owned shelter within compound of existing cell tower. No structural changes or additional electrical work needed. | Orleans Parish | — |
| Dec 30, 2022 | Renovation (Non-Structural) | Placing 2 2' microwaves on Verizon owned shelter within compound of existing cell tower. No structural changes or additional electrical work needed. | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- Issued104
- Closed8
- Finaled5
- C/o issued4
- Void3
- Not stated1
- Documents submitted1
- Reviews in progress1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.