Contractor · Electrical

A K ELECTRIC CONTRACTORS INC

127 building permits since 2008 in Los Angeles city, CA; Sacramento city, CA and Elk Grove city, CA, across 3 counties — $66,800 in reported job value over 37 permits that state one.

Building permits
127
Reported job value
$66.8K
Active
2008–2026
Latest permit
May 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA83
  • Sacramento city, CA22
  • Elk Grove city, CA12
  • Sacramento County, CA3
  • Burbank city, CA3
  • Norwalk city, CA3
  • Anaheim city, CA1

Permits by year

By issue date (application date where there is none).

01020
20
200820142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20081
20093
201319
201412
20155
20163
20171
20182
201920
202012
202110
20224
20233
202415
202514
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical127
  • EV chargers27
  • Remodels5
  • Electric meters2
  • Generators1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical86
  • Single Family19
  • ONLINE VEHICLE CHARGING PERMIT12
  • MISR3
  • Residential Electrical3
  • Duplex1
  • EV Charging Station1
  • Industrial1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 6, 2026Single FamilyEPC - install 40Amp EV circuit for NEMA 14-50 outlet. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: ResidenSacramento$700
Mar 30, 2026Single FamilyEPC - install 40 Amp EV circuit for a Level 2 hardwired EVSE. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note:Sacramento$850
Mar 5, 2026Single FamilyEPC - install 40 amp circuit and NEMA 14-50 EV outlet for Level 2 Plug-in mobile 32A EV charger. Water conserving fixtures are required to be installed throughoSacramento$1,150
Dec 8, 2025MISRInstall 40Amp EV circuit for NEMA 14-50 outlet.Sacramento County$1,200
Nov 6, 2025Single FamilyInstall 40 amp e charging circuit and nema 14-50 plug for 32 amp plug-in charger.Sacramento$900
Aug 14, 2025DuplexUpgrade duplex existing, overhead 100 amp electrical service panels to 200 amp service panels on the same location. AA: existing panel 100 Amps - Overhead serviSacramento$5,000
Aug 5, 2025ONLINE VEHICLE CHARGING PERMITinstall NEMA 14-50 outlet for Level 2 EV charging cableElk Grove City$950
Jun 17, 2025ONLINE VEHICLE CHARGING PERMITinstall 40 A EV circuit for a level 2 EVSEElk Grove City$1,400

Permit status

Where its permits stand, as the departments report them.

  • Not stated84
  • Issued23
  • Closed11
  • Completed5
  • Finaled4

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • A K ELECTRIC INC
  • A K ELECTRIC
  • AK ELECTRIC
  • AK ELECTRIC INC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.