Contractor · Electrical
A K ELECTRIC CONTRACTORS INC
127 building permits since 2008 in Los Angeles city, CA; Sacramento city, CA and Elk Grove city, CA, across 3 counties — $66,800 in reported job value over 37 permits that state one.
- Building permits
- 127
- Reported job value
- $66.8K
- Active
- 2008–2026
- Latest permit
- May 6, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA83
- Sacramento city, CA22
- Elk Grove city, CA12
- Sacramento County, CA3
- Burbank city, CA3
- Norwalk city, CA3
- Anaheim city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2008 | 1 |
| 2009 | 3 |
| 2013 | 19 |
| 2014 | 12 |
| 2015 | 5 |
| 2016 | 3 |
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 20 |
| 2020 | 12 |
| 2021 | 10 |
| 2022 | 4 |
| 2023 | 3 |
| 2024 | 15 |
| 2025 | 14 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical127
- EV chargers27
- Remodels5
- Electric meters2
- Generators1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical86
- Single Family19
- ONLINE VEHICLE CHARGING PERMIT12
- MISR3
- Residential Electrical3
- Duplex1
- EV Charging Station1
- Industrial1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 6, 2026 | Single Family | EPC - install 40Amp EV circuit for NEMA 14-50 outlet. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residen | Sacramento | $700 |
| Mar 30, 2026 | Single Family | EPC - install 40 Amp EV circuit for a Level 2 hardwired EVSE. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: | Sacramento | $850 |
| Mar 5, 2026 | Single Family | EPC - install 40 amp circuit and NEMA 14-50 EV outlet for Level 2 Plug-in mobile 32A EV charger. Water conserving fixtures are required to be installed througho | Sacramento | $1,150 |
| Dec 8, 2025 | MISR | Install 40Amp EV circuit for NEMA 14-50 outlet. | Sacramento County | $1,200 |
| Nov 6, 2025 | Single Family | Install 40 amp e charging circuit and nema 14-50 plug for 32 amp plug-in charger. | Sacramento | $900 |
| Aug 14, 2025 | Duplex | Upgrade duplex existing, overhead 100 amp electrical service panels to 200 amp service panels on the same location. AA: existing panel 100 Amps - Overhead servi | Sacramento | $5,000 |
| Aug 5, 2025 | ONLINE VEHICLE CHARGING PERMIT | install NEMA 14-50 outlet for Level 2 EV charging cable | Elk Grove City | $950 |
| Jun 17, 2025 | ONLINE VEHICLE CHARGING PERMIT | install 40 A EV circuit for a level 2 EVSE | Elk Grove City | $1,400 |
Permit status
Where its permits stand, as the departments report them.
- Not stated84
- Issued23
- Closed11
- Completed5
- Finaled4
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- A K ELECTRIC INC
- A K ELECTRIC
- AK ELECTRIC
- AK ELECTRIC INC
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.