Contractor · Electrical

Saulo Queiroz

130 building permits since 2015 in Stamford town, CT; Darien town, CT and Stratford town, CT, across 3 counties — $436,211 in reported job value over 117 permits that state one.

Building permits
130
Reported job value
$436.2K
Active
2015–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stamford town, CT44
  • Darien town, CT24
  • Stratford town, CT22
  • Ridgefield town, CT11
  • New Canaan town, CT10
  • Redding town, CT9
  • Brookfield town, CT3
  • New Milford town, CT3
  • Trumbull town, CT2
  • Branford town, CT1

Permits by year

By issue date (application date where there is none).

01530
28
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20151
20161
20171
20186
20194
20205
202112
20221
202321
202423
202527
2026 (YTD)28

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical128
  • EV chargers65
  • Electric meters21
  • Kitchens12
  • Generators12
  • Bathrooms6
  • HVAC5
  • Remodels4
  • New construction4
  • Battery storage2

Permit types

As the building departments classify them.

  • Electrical Permit118
  • Electrical (& Portable Generators)9
  • EL21
  • Residential Building Permit1
  • Residential Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026Electrical PermitInstalling a 48A Tesla charger to the exterior siding of the house from the main electrical panel.Stratford Town$1,987
Oct 13, 2026Electrical PermitTo add a 48A Tesla EV charger to one of the garages by pulling power from the existing sub-panel in there with a load management if needed.Darien Town$2,350
Oct 5, 2026Electrical PermitTo add a 48A Tesla charger to the back of the garage by running a dedicated 60A 240V circuit from the 200A main panel and control it with a load management meteBrookfield Town$2,352
Sep 28, 2026Electrical PermitUpgrading service from 100 to 200 amps, and relocating to left side with mast system to meet Eversource's roof guidelines.Darien Town—
Sep 8, 2026Electrical PermitInstalling a Tesla hardwired charger in the garage from the 100A panel and put a load management system to avoid overloading panel.Stratford Town$1,938
Sep 8, 2026Electrical PermitTo install a Rivian EV charger with a 50A circuit and add a Generac load shed.New Canaan Town$1,663
Aug 26, 2026Electrical PermitAdding a 48A Emporia EV charger in the garage controlled by a load management in the main 200 amp panel.Branford Town$1,900
Aug 20, 2026Electrical (& Portable Generators)Run a 60A 240V circuit from the 200A panel and install a 48A Tesla charger controlled by a load managementRedding Town$2,214

Permit status

Where its permits stand, as the departments report them.

  • Completed106
  • Active24

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.