Contractor · Electrical
Saulo Queiroz
130 building permits since 2015 in Stamford town, CT; Darien town, CT and Stratford town, CT, across 3 counties — $436,211 in reported job value over 117 permits that state one.
- Building permits
- 130
- Reported job value
- $436.2K
- Active
- 2015–2026
- Latest permit
- Oct 23, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT44
- Darien town, CT24
- Stratford town, CT22
- Ridgefield town, CT11
- New Canaan town, CT10
- Redding town, CT9
- Brookfield town, CT3
- New Milford town, CT3
- Trumbull town, CT2
- Branford town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 6 |
| 2019 | 4 |
| 2020 | 5 |
| 2021 | 12 |
| 2022 | 1 |
| 2023 | 21 |
| 2024 | 23 |
| 2025 | 27 |
| 2026 (YTD) | 28 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical128
- EV chargers65
- Electric meters21
- Kitchens12
- Generators12
- Bathrooms6
- HVAC5
- Remodels4
- New construction4
- Battery storage2
Permit types
As the building departments classify them.
- Electrical Permit118
- Electrical (& Portable Generators)9
- EL21
- Residential Building Permit1
- Residential Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 23, 2026 | Electrical Permit | Installing a 48A Tesla charger to the exterior siding of the house from the main electrical panel. | Stratford Town | $1,987 |
| Oct 13, 2026 | Electrical Permit | To add a 48A Tesla EV charger to one of the garages by pulling power from the existing sub-panel in there with a load management if needed. | Darien Town | $2,350 |
| Oct 5, 2026 | Electrical Permit | To add a 48A Tesla charger to the back of the garage by running a dedicated 60A 240V circuit from the 200A main panel and control it with a load management mete | Brookfield Town | $2,352 |
| Sep 28, 2026 | Electrical Permit | Upgrading service from 100 to 200 amps, and relocating to left side with mast system to meet Eversource's roof guidelines. | Darien Town | — |
| Sep 8, 2026 | Electrical Permit | Installing a Tesla hardwired charger in the garage from the 100A panel and put a load management system to avoid overloading panel. | Stratford Town | $1,938 |
| Sep 8, 2026 | Electrical Permit | To install a Rivian EV charger with a 50A circuit and add a Generac load shed. | New Canaan Town | $1,663 |
| Aug 26, 2026 | Electrical Permit | Adding a 48A Emporia EV charger in the garage controlled by a load management in the main 200 amp panel. | Branford Town | $1,900 |
| Aug 20, 2026 | Electrical (& Portable Generators) | Run a 60A 240V circuit from the 200A panel and install a 48A Tesla charger controlled by a load management | Redding Town | $2,214 |
Permit status
Where its permits stand, as the departments report them.
- Completed106
- Active24
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.