Contractor · Electrical
BELLA ENERGY
130 building permits since 2007 in Boulder city, CO; Boulder County, CO and Thornton city, CO, across 2 counties — $10,681,992 in reported job value over 122 permits that state one.
- Building permits
- 130
- Reported job value
- $10.7M
- Active
- 2007–2013
- Latest permit
- Nov 1, 2013
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO101
- Boulder County, CO23
- Thornton city, CO6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2007 | 1 |
| 2008 | 32 |
| 2009 | 48 |
| 2010 | 41 |
| 2011 | 7 |
| 2013 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical129
- Solar123
- Roofing14
- Battery storage3
- HVAC1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical Permit100
- Solar Electrical System23
- Electrical6
- Roofing Replacement Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 1, 2013 | Electrical Permit | Reinstallation of 8.46 kW solar array following reroof. | Boulder | $4,500 |
| May 12, 2011 | Electrical Permit | Installation of a 54.28 kW flush-mount and tilt-up photovoltaic system -- several arrays spread out over the roof. Sub-arrays #1 and #2 are 10 degree tilt-up -- | Boulder | $237,144 |
| Apr 13, 2011 | Electrical Permit | Installation of an 8 kW flush mounted photovoltaic array -- panels to remain below ridge, inside of rakes and above eave. | Boulder | $51,722 |
| Mar 23, 2011 | Electrical Permit | PV installation on warehouse building. Flush mounted and tilt-up (23 deg), grid-tied, and 89.7 kW. | Boulder | $489,440 |
| Feb 18, 2011 | Electrical Permit | Installation of a 100 kW photovoltaic array -- ballasted system at a 10 degree tilt, inverters to be mounted on the side of an existing mechanical equipment pen | Boulder | $640,000 |
| Feb 18, 2011 | Electrical Permit | PV installation on Mountain View United Methodist Church. Flush mounted, grid tied, and 43 kW. | Boulder | $264,708 |
| Feb 3, 2011 | Solar Electrical System | Solar PV System 9.635kw Flush Roof Mounted, Grid Tied on Residence | Boulder County | $77,080 |
| Jan 13, 2011 | Electrical Permit | Installation of 4.37 kW solar array, flush mounted and grid tied. | Boulder | $22,907 |
Permit status
Where its permits stand, as the departments report them.
- Completed100
- Closed27
- Void1
- Issued1
- Withdrawn1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.