Contractor · Electrical
AAA ELECTRICAL OF NC LLC
130 building permits since 2016 in Chesterfield County, VA; Currituck County, NC and Brassfield township, NC, across 18 counties — $285,562 in reported job value over 75 permits that state one.
- Building permits
- 130
- Reported job value
- $285.6K
- Active
- 2016–2026
- Latest permit
- Nov 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Chesterfield County, VA23
- Currituck County, NC13
- Brassfield township, NC11
- Cary town, NC10
- Creedmoor city, NC8
- Pender County, NC6
- Jacksonville city, NC6
- Henrico County, VA5
- Petersburg city, VA5
- Brunswick County, NC4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 1 |
| 2019 | 2 |
| 2020 | 26 |
| 2021 | 2 |
| 2022 | 25 |
| 2023 | 26 |
| 2024 | 9 |
| 2025 | 13 |
| 2026 (YTD) | 23 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical97
- Generators94
- Gas11
- HVAC9
- Remodels6
- Plumbing1
- Heat pumps1
- Electric meters1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Residential Electrical26
- EL-Generator23
- Electrical11
- Residential Electrical - New9
- MC-Change Out Unit8
- CSS RESIDENTIAL APPLICATION7
- Residential Electrical Stand Alone Permit7
- CSS TRADE PERMITS6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 4, 2026 | Residential Electrical - New | Generator Installation - 24/22.5 kW Next Generation Air-Cooled Generac | Richlands township | — |
| Nov 4, 2026 | Residential Electrical - New | GENERATOR INSTALLATION - 28/25 KW NEXTGENERATION AIR-COOLED GENERACSTANDBY GENERATOR ONLY | Jacksonville township | — |
| Sep 22, 2026 | Residential Electrical | Generator Installation: 26/24 kW next generation air-cooled Generac standby. **AMENDMENT to replace two electrical panels, install two ground rods, install 2 PS | Chesterfield County | $5,200 |
| Sep 22, 2026 | Residential Electrical | Generator Installation: 22/21 kW next generation air-cooled Generac standby. | Chesterfield County | $3,200 |
| Sep 1, 2026 | Residential Electrical | Installation of a 24/22.5 kw, Next Generation Air-Cooled Generator stanby. | Chesterfield County | $3,300 |
| Aug 25, 2026 | CSS RESIDENTIAL APPLICATION | GENERATOR: Install 24/2235kw generator air-cooled Generac | Currituck County | $3,300 |
| Aug 19, 2026 | CSS RESIDENTIAL APPLICATION | TRADE: Generator Install on standard pad. | Currituck County | $3,350 |
| Aug 19, 2026 | Project | Generator Installation | Emerald Isle Town | $3,400 |
Permit status
Where its permits stand, as the departments report them.
- Completed47
- Issued27
- Active17
- C/o issued13
- Approved10
- Expired6
- Finaled6
- Closed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.