Contractor · Plumbing

Mall City Mechanical, Inc

131 building permits since 2006 in St. Joseph city, MI and Lincoln charter township, MI.

Building permits
131
Reported job value
—
Active
2006–2026
Latest permit
Oct 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • St. Joseph city, MI129
  • Lincoln charter township, MI2

Permits by year

By issue date (application date where there is none).

012.525
22
2007201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20066
20074
20081
20094
20112
20122
20131
20148
20154
20164
20174
201810
20194
20207
202120
20229
20238
20247
20254
2026 (YTD)22

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing67
  • HVAC65
  • Gas23
  • Remodels6
  • Heat pumps5
  • Kitchens2
  • Roofing2
  • Water heaters2
  • Additions1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Plumbing66
  • Mechanical65

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 20, 2026Mechanical3RD FLOOR PHASE 1B: DAMPER (9) HYDRONIC PIPING (370) DUCT (2625) V.AV. BOX (20) ADDITIONAL INSP (2)St. Joseph City—
Oct 20, 2026Mechanical7TH FLOOR PHASE 1A: HUMIDIFIER (2) HYDRONIC PIPING (800) DUCT (236) HEAT PUMP (4) AIR HANDLERS (2) COIL (1) ADDITIONAL INSP (2)St. Joseph City—
Oct 20, 2026Mechanical5TH FLOOR SOUTH PHASE 2B: DUCT (1250) DAMPER (5) ADDTIONAL INSP (2)St. Joseph City—
Oct 20, 2026Mechanical5TH FLOOR NORTH PHASE 1C: DAMPER (5) HYDRONIC PIPING (575) DUCT (1519) VAV BOX (6) ADDITIONAL INSP (2)St. Joseph City—
Oct 20, 2026Mechanical4TH FLOOR PHASE 2A: HEAT PUMP (1) HYDRONIC PIPING (580) DUCT (2648) V.A.V. BOX (11) ADDITIONAL INSP (2)St. Joseph City—
Oct 20, 2026MechanicalPHASE 1D 1ST FLOOR: DAMPER (2) DUCT (355) ADDITIONAL INSP (2)St. Joseph City—
Oct 20, 2026Plumbing3RD FLOOR PHASE 1B: FIXTURES (18) SEWER LESS THAN 6" (7) 3/4" WATER DISTR PIPE (1) 1" WDP (1) 1-1/2" WDP (1) OVER 2" (1) ADDITIONAL INSP (2)St. Joseph City—
Oct 20, 2026Plumbing1ST FLOOR PHASE 1D: FIXTURES (16) SEWER LESS THAN 6" (5) 3/4" WATER DISTR PIPE (1) 1" WATER DIST PIPE (1) OVER 2" DIST PIPE (1) ADDITIONAL INSP (2)St. Joseph City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled103
  • Issued17
  • Closed5
  • Cancelled4
  • Expired1
  • Reviews complete1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.