Contractor · Electrical
Frederick Souza
1,140 building permits since 2014 in Bristol town, RI; East Providence city, RI and South Kingstown town, RI, across 8 counties — $5,574,444 in reported job value over 911 permits that state one.
- Building permits
- 1,140
- Reported job value
- $5.6M
- Active
- 2014–2025
- Latest permit
- Jan 21, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bristol town, RI219
- East Providence city, RI90
- South Kingstown town, RI80
- Barrington town, RI79
- Warwick city, RI67
- Providence city, RI66
- Cranston city, RI53
- Narragansett town, RI46
- Newport city, RI45
- Middletown town, RI31
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2015 | 1 |
| 2017 | 15 |
| 2018 | 72 |
| 2019 | 98 |
| 2020 | 70 |
| 2021 | 126 |
| 2022 | 189 |
| 2023 | 273 |
| 2024 | 294 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical1.1K
- HVAC436
- Heat pumps249
- Generators146
- Electric meters48
- Bathrooms35
- Kitchens31
- Remodels21
- Plumbing19
- Pools & hot tubs19
Permit types
As the building departments classify them.
- Electrical Permit1.1K
- 2) Electrical Permit53
- EG Electrical Permit10
- ELECT.1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 21, 2025 | Electrical Permit | — | South Kingstown Town | — |
| Nov 23, 2024 | Electrical Permit | -Wire in 10KW generac generator & 12 circuit transfer switch. -Equipment being supplied and installed by others. | East Providence City | $2,200 |
| Nov 12, 2024 | Electrical Permit | -Wire in 24KW generac & 200A transfer switch. -Equipment supplied and installed by Sunshine Fuels. | East Providence City | $1,800 |
| Nov 12, 2024 | Electrical Permit | -Run new circuit to condenser w/ disconnect and whip. -Install service outlet. -Run circuit for air handler in basement. -Equipment being supplied and installed | Warwick City | $800 |
| Nov 12, 2024 | Electrical Permit | -Run new circuit for condenser. -Replace breaker panel. | Warwick City | $3,000 |
| Nov 7, 2024 | Electrical Permit | -Run new circuit for condenser. -Install service outlet. -Equipment being supplied and installed by others. | Providence City | $700 |
| Nov 5, 2024 | Electrical Permit | — | Hopkinton Town | — |
| Nov 1, 2024 | Electrical Permit | Removed existing FPLR cable and replace with proper coded fire alarm MC. | Woonsocket City | $1,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed675
- Active442
- Stop work ordered22
- Approved1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.