Contractor · Electrical

Frederick Souza

1,140 building permits since 2014 in Bristol town, RI; East Providence city, RI and South Kingstown town, RI, across 8 counties — $5,574,444 in reported job value over 911 permits that state one.

Building permits
1,140
Reported job value
$5.6M
Active
2014–2025
Latest permit
Jan 21, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bristol town, RI219
  • East Providence city, RI90
  • South Kingstown town, RI80
  • Barrington town, RI79
  • Warwick city, RI67
  • Providence city, RI66
  • Cranston city, RI53
  • Narragansett town, RI46
  • Newport city, RI45
  • Middletown town, RI31

Permits by year

By issue date (application date where there is none).

0150300
294
201420172019202120232025
View as table
YearPermits
20141
20151
201715
201872
201998
202070
2021126
2022189
2023273
2024294
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical1.1K
  • HVAC436
  • Heat pumps249
  • Generators146
  • Electric meters48
  • Bathrooms35
  • Kitchens31
  • Remodels21
  • Plumbing19
  • Pools & hot tubs19

Permit types

As the building departments classify them.

  • Electrical Permit1.1K
  • 2) Electrical Permit53
  • EG Electrical Permit10
  • ELECT.1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 21, 2025Electrical Permit—South Kingstown Town—
Nov 23, 2024Electrical Permit-Wire in 10KW generac generator & 12 circuit transfer switch. -Equipment being supplied and installed by others.East Providence City$2,200
Nov 12, 2024Electrical Permit-Wire in 24KW generac & 200A transfer switch. -Equipment supplied and installed by Sunshine Fuels.East Providence City$1,800
Nov 12, 2024Electrical Permit-Run new circuit to condenser w/ disconnect and whip. -Install service outlet. -Run circuit for air handler in basement. -Equipment being supplied and installedWarwick City$800
Nov 12, 2024Electrical Permit-Run new circuit for condenser. -Replace breaker panel.Warwick City$3,000
Nov 7, 2024Electrical Permit-Run new circuit for condenser. -Install service outlet. -Equipment being supplied and installed by others.Providence City$700
Nov 5, 2024Electrical Permit—Hopkinton Town—
Nov 1, 2024Electrical PermitRemoved existing FPLR cable and replace with proper coded fire alarm MC.Woonsocket City$1,000

Permit status

Where its permits stand, as the departments report them.

  • Completed675
  • Active442
  • Stop work ordered22
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.