Contractor · Electrical
Mr Electric of Gastonia*
133 building permits since 2019 in Gaston County, NC — $435,606 in reported job value over 17 permits that state one.
- Building permits
- 133
- Reported job value
- $435.6K
- Active
- 2019–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gaston County, NC133
Permits by year
By issue date (application date where there is none).
02550
42
2020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 7 |
| 2020 | 14 |
| 2021 | 9 |
| 2022 | 14 |
| 2023 | 16 |
| 2024 | 14 |
| 2025 | 17 |
| 2026 (YTD) | 42 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical123
- Electric meters42
- EV chargers9
- Pools & hot tubs5
- Windows & doors3
- Gas2
- HVAC2
- Additions2
- Solar1
- Remodels1
Permit types
As the building departments classify them.
- Single Trade (Residential) - Electrical109
- Electrical - Commercial12
- Building Permit Request: Residential Accessory Structure2
- HVAC Change Out - Gas2
- Addition (Residential)1
- Building Permit Request: Commercial Alteration/Remodel1
- Owner Building (Residential) - Owner Contractor1
- Pool - Above Ground (Residential)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Single Trade (Residential) - Electrical | Whole home generator installation | Gaston County | — |
| Oct 19, 2026 | Single Trade (Residential) - Electrical | EV Charger | Gaston County | — |
| Oct 1, 2026 | Single Trade (Residential) - Electrical | 200 Amp indoor panel with grounding/ EV Charger | Gaston County | — |
| Sep 25, 2026 | Single Trade (Residential) - Electrical | 200 Amp Outdoor panel with grounding | Gaston County | — |
| Sep 17, 2026 | Single Trade (Residential) - Electrical | 200 Amp outdoor panel with grounding system | Gaston County | — |
| Sep 1, 2026 | Single Trade (Residential) - Electrical | Panel Relocation | Gaston County | — |
| Sep 1, 2026 | Single Trade (Residential) - Electrical | 200 Amp Indoor panel with Grounding/ Riser and meter base for 200Amp Outdoor panel | Gaston County | — |
| Aug 25, 2026 | Single Trade (Residential) - Electrical | 200 Amp indoor panel | Gaston County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed110
- Issued13
- Expired5
- Cancelled3
- Void2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.