Contractor · Specialty (solar, fire, telecom)
SOLECTRIC
135 building permits since 2017 in Davis city, CA; Sacramento city, CA and Sacramento County, CA, across 2 counties — $3,132,380 in reported job value over 124 permits that state one.
- Building permits
- 135
- Reported job value
- $3.1M
- Active
- 2017–2026
- Latest permit
- Oct 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Davis city, CA52
- Sacramento city, CA41
- Sacramento County, CA31
- Elk Grove city, CA10
- Citrus Heights city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 5 |
| 2018 | 5 |
| 2019 | 10 |
| 2020 | 14 |
| 2021 | 10 |
| 2022 | 25 |
| 2023 | 21 |
| 2024 | 14 |
| 2025 | 17 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar109
- Electrical62
- Plumbing31
- Water heaters30
- Battery storage10
- EV chargers4
- Generators3
- Roofing2
- HVAC1
- Remodels1
Permit types
As the building departments classify them.
- PHOTOVALTIC RESIDENTIAL40
- Single Family40
- MISR22
- ELECTRIC RESIDENTIAL8
- ELECTRICAL7
- COXX6
- Electrical4
- ONLINE SOLAR PHOTOVOLTAIC PERMITS3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2026 | MISR | · (19) Q.TRON BLK M-G2+ 430 MODULES· (07) TESLA SOLAR SHUTDOWN DEVICE MCI-2 HIGH CURRENT · (01) TESLA POWERWALL 3 (11.5KW, 13.5KWH) · (01) POWERWALL 3 DC EXPANS | Sacramento County | $3,400 |
| Sep 3, 2026 | Single Family | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, | Sacramento | $22,000 |
| Aug 4, 2026 | ELECTRIC RESIDENTIAL | R/R PV SYSTEM FOR REROOF | Davis City | $6,000 |
| Jul 31, 2026 | Single Family | 5.74kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change- | Sacramento | $30,170 |
| Apr 30, 2026 | MISR | · INSTALLATION CONSISTS OF PHOTOVOLTAIC, BATTERIE(S) AND RELATED ELECTRICAL METERING AND SAFETY EQUIPMENT FOR HOME BACKUP. · ALL COMPONENTS ARE UL LISTED AND CE | Sacramento County | $68,564 |
| Apr 27, 2026 | Single Family | 9.89kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). | Sacramento | $68,565 |
| Mar 31, 2026 | ONLINE SOLAR PHOTOVOLTAIC PERMITS | Installation of an ESS 13.5KWH, PV solar are existing | Elk Grove City | $17,250 |
| Mar 2, 2026 | MISR | · INSTALLATION CONSISTS OF PHOTOVOLTAIC, BATTERIE(S) AND RELATED ELECTRICAL METERING AND SAFETY EQUIPMENT FOR HOME BACKUP. · ALL COMPONENTS ARE UL LISTED AND CE | Sacramento County | $30,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed65
- Issued47
- Finaled10
- Closed9
- Active1
- Expired1
- Withdrawn1
- Stop work ordered1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.