Contractor · Specialty (solar, fire, telecom)
Green Ridge Solar
137 building permits since 2019 in Douglas County, OR; Bend city, OR and Tualatin city, OR, across 5 counties — $2,015,168 in reported job value over 56 permits that state one.
- Building permits
- 137
- Reported job value
- $2M
- Active
- 2019–2026
- Latest permit
- Nov 6, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Douglas County, OR39
- Bend city, OR34
- Tualatin city, OR22
- Tigard city, OR14
- Roseburg city, OR11
- Sutherlin city, OR5
- Canyonville city, OR2
- Clatskanie city, OR2
- Myrtle Creek city, OR2
- Winston city, OR2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 3 |
| 2020 | 9 |
| 2021 | 15 |
| 2022 | 13 |
| 2023 | 17 |
| 2024 | 10 |
| 2025 | 35 |
| 2026 (YTD) | 35 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar127
- Electrical72
- Battery storage19
- Roofing3
- Remodels2
- Additions2
- Plumbing1
Permit types
As the building departments classify them.
- Electrical61
- Building35
- SOLAR - RESIDENTIAL 1 AND 221
- Residential Renewable Energy - Prescriptive8
- Residential Electrical4
- Residential Addition or Alteration2
- Residential Structural2
- DURHAM BUILDING1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 6, 2026 | Residential Renewable Energy - Prescriptive | Solar Installation Specialty Code Application | Tigard | $20,020 |
| Oct 28, 2026 | Electrical | Removal and reinstall of solar panels for roof work no permit for roof as of yet no expired/conditions chw | Bend | — |
| Oct 21, 2026 | Building | Installation and hook up of 8.36 kW roof mounted solar system | Roseburg city | — |
| Oct 21, 2026 | Building | Installation and hook up of 21.12 kW roof mounted solar - on SHOP but electrical connected to both house and shop | Douglas County | — |
| Oct 21, 2026 | Electrical | Installation and hook up of 8.36 kW roof mounted solar system | Roseburg city | — |
| Oct 21, 2026 | Electrical | Installation and hook up of 10.56 kW solar system connected to the house with battery back-up | Douglas County | — |
| Oct 21, 2026 | Electrical | SHOP: Installation and hook up of 10.56 kW roof mounted solar system with battery back-up | Douglas County | — |
| Oct 6, 2026 | Electrical | Installation and interconnection of a 5.76kW Roof mount solar system with Battery and (1) 200a service for the MSP and (1) 200a service for the battery. *no con | Bend | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled50
- Closed48
- Active21
- Issued5
- Expired4
- Reviews in progress4
- Void2
- Not stated2
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- GREEN RIDGE SOLAR INC
- GREENRIDGE SOLAR
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.