Contractor · Electrical
IRBY Construction
139 building permits since 2023 in Charlotte County, FL.
- Building permits
- 139
- Reported job value
- —
- Active
- 2023–2026
- Latest permit
- Jul 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Charlotte County, FL139
Permits by year
By issue date (application date where there is none).
04080
73
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2024 | 35 |
| 2025 | 73 |
| 2026 (YTD) | 30 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Additions1
- Electrical1
Permit types
As the building departments classify them.
- LD - ROW Utility-Internet139
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 18, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTONDA 61 / EL CAMPO MR WR#12844344 INSTALL 2 NEW POLES AND EQUIPMENT FOR POWER DISTRIBUTION. PLEASE SEE PLANS FOR DETAILS. | Charlotte County | — |
| Jul 18, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTONDA 61 / EL CAMPO UG WR#12766171 INSTALL: PROPOSED 7744' DIRECTIONAL BORE IN ROW TO INSTALL CONDUIT AND EQUIPMENT FOR POWER DISTRIBUTION. PLEASE SE | Charlotte County | — |
| Jun 1, 2026 | LD - ROW Utility-Internet | FPL SSUP MURDOCK 65 / PEACHLAND COMMERCIAL MR WR#11899992 Install Plan: REPLACE 1 ADD OH EQUIPMENT TO 3 EXISTING POLES. PLEASE SEE PLANS FOR DETAILS. | Charlotte County | — |
| Apr 23, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTUNDA 61/ PINEHURST MR WR#12884607 Install Plan: REPLACE 3 POLES ADD OH EQUIPMENT TO 1 EXISTING POLES. PLEASE SEE PLANS FOR DETAILS. | Charlotte County | — |
| Apr 23, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTUNDA 61/ TRUMAN MR WR#12826018 Install Plan: PROPOSED 170' OF DIRECTIONAL BORE TO ADD CONDUIT AND ADD EQUIPMENT TO 2 EXISTING POLES. PLEASE SEE PLAN | Charlotte County | — |
| Apr 6, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTUNDA 61 / FIRE ISLE UG WR#12767172 Install Plan: Proposed 26,441' UG Directional Bore to Install Conduit and Equipment for Power Distribution in ROW | Charlotte County | — |
| Apr 6, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTUNDA 61/ FIRE ISLE MR WR#13053281 Install Plan: REPLACE 1 ADD OH EQUIPMENT TO 2 EXISTING POLES. PLEASE SEE PLANS FOR DETAILS. | Charlotte County | — |
| Apr 3, 2026 | LD - ROW Utility-Internet | FPL SSUP ROTUNDA 61/ FOX MR WR#12838263 Install Plan: REPLACE 1 EXISTING POLE IN ROW AND INSTALL 562' OF CONDUIT FOR POWER DISTRIBUTION. PLEASE SEE PLANS FOR DE | Charlotte County | — |
Permit status
Where its permits stand, as the departments report them.
- Closed62
- Expired39
- Issued34
- Cancelled3
- Reviews in progress1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.