Contractor · Electrical
CAPE FEAR SOLAR SYSTEMS LLC
1,217 building permits since 2013 in Brunswick County, NC; Pender County, NC and Cary town, NC, across 13 counties — $101,299,641 in reported job value over 1,014 permits that state one.
- Building permits
- 1,217
- Reported job value
- $101.3M
- Active
- 2013–2026
- Latest permit
- Oct 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Brunswick County, NC737
- Pender County, NC145
- Cary town, NC55
- Stump Sound township, NC28
- Greensboro city, NC25
- Oak Island town, NC20
- Swansboro township, NC19
- Jacksonville city, NC19
- Surf City town, NC19
- Harnett County, NC18
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2018 | 3 |
| 2019 | 44 |
| 2020 | 39 |
| 2021 | 109 |
| 2022 | 171 |
| 2023 | 170 |
| 2024 | 209 |
| 2025 | 256 |
| 2026 (YTD) | 182 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar948
- Electrical653
- Remodels329
- Battery storage165
- EV chargers126
- Additions38
- Roofing15
- Generators11
- Electric meters6
- HVAC3
Permit types
As the building departments classify them.
- ELECTRICAL346
- REMODEL/REPAIR254
- Electrical85
- Solar Panel - Option No 155
- RECONNECT54
- Residential Accessory - Solar Panels - Roof Mounted48
- Residential Electrical - Residential Electrical.244
- Residential Alteration and Repair41
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 30, 2026 | Solar Panel - Option No 1 | Installation of 36-panel, 12.564kW solar PV system. This PV system will be ground-mounted. | Pender County | $33,740 |
| Oct 29, 2026 | Single Trade (Residential) - Electrical | Install electric conduit, wire, circuit breaker, and labor associated with the installation of a home EV charger (EVSE) in accordance with NEC 625 and the local | Gaston County | — |
| Oct 22, 2026 | Residential Electrical - New | Install electric conduit, wire, circuit breaker, and labor associated with the installation of a home EV charger (EVSE) in accordance with NEC 625 and the local | Half Moon CDP | — |
| Oct 21, 2026 | Residential Electrical Stand Alone Permit | Replacing The Tesla Backup Gateway 2 for a new one. ***"We will need to schedule a power shut off and a reconnect in order to replace the Gateway"**** | Pender County | — |
| Oct 21, 2026 | Solar Panel - Option No 2 | installation of 30 rooftop PV solar panels and 1 battery | Pender County | $28,117 |
| Oct 20, 2026 | BUILDING | Installation of 22-panel, 7.678kW-AC rooftop solar PV system with two batteries. Replacing existing 200A service panel with new 200A SPAN smart panel. | Oak Island | — |
| Oct 14, 2026 | Electrical Permit | — | Lincoln County | — |
| Oct 9, 2026 | Electrical | Solar PV System | Town Of Cary | $51,886 |
Permit status
Where its permits stand, as the departments report them.
- Active737
- Completed208
- Approved63
- C/o issued49
- Finaled40
- Expired34
- Closed33
- Void16
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.