Contractor · Plumbing
Charles K Sardi
1,224 building permits since 2012 in Orleans Parish, LA.
- Building permits
- 1,224
- Reported job value
- —
- Active
- 2012–2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA1.2K
Permits by year
By issue date (application date where there is none).
0125250
205
20142017202020232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 18 |
| 2013 | 205 |
| 2014 | 65 |
| 2015 | 186 |
| 2016 | 105 |
| 2017 | 125 |
| 2018 | 35 |
| 2019 | 32 |
| 2020 | 166 |
| 2021 | 98 |
| 2022 | 9 |
| 2023 | 83 |
| 2024 | 25 |
| 2025 | 52 |
| 2026 (YTD) | 20 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical920
- HVAC830
- Plumbing462
- Water heaters407
- Roofing254
- Heat pumps161
- Gas151
- New construction46
- Generators31
- Remodels15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | — | INSTALLATION OF HVAC EQUIPMENT FOR A NEW FOUR-STORY, 50-UNIT MULTIFAMILY RESIDENTIAL DEVELOPMENT CONSISTING OF AIR HANDLING UNITS, CONDENSING UNITS/HEAT PUMPS, | Orleans Parish | — |
| Sep 29, 2026 | — | Floor 4 of this 8‑story office building scope Includes Installation of FCU-4.1 (DX) serving elevator control room; CU-4.1 paired with FCU-4.1. this Includes ass | Orleans Parish | — |
| Aug 4, 2026 | — | Floor 3 of a 3-story renovation. Install one (1) 2.5-ton heat pump split system including air handler, condensing unit on the roof, refrigerant piping, condensa | Orleans Parish | — |
| Jun 29, 2026 | — | Installation of a complete HVAC system on Floors 5-8 of an 8-story Office Building. Work includes installation of dry coolers, computer room air conditioning (C | Orleans Parish | — |
| Jun 2, 2026 | — | The roof and penthouse of this 8-story office Building include installation of ACWCU‑1 and ACWCU‑2 air‑cooled water chillers serving the building chilled water | Orleans Parish | — |
| May 14, 2026 | — | Floor 6 of this 8‑story office building scope Includes AHU 6.1 and AHU 6.2 supplying conditioned air to VAV terminal units, each receiving outdoor air through V | Orleans Parish | — |
| May 4, 2026 | — | FIRST FLOOR OF 3 STORY RENOVAVATION THAT IS CONDITIONED BY DUCTED SPLIT-SYSTEM HEAT PUMPS SERVING RESIDENTIAL UNITS AND ASSOCIATED SPACES. EQUIPMENT ON THIS LEV | Orleans Parish | — |
| Apr 21, 2026 | — | Floor 5 of this 8-story building Scope includes Underfloor interior zones that are served by dual‑path AHU‑5.1 and AHU‑5.2, with the Telecom space served by FCU | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- C/o issued1.1K
- Issued89
- Finaled75
- Expired2
- Void1
- Not stated1
- Duplicate1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.