Contractor · Electrical
Brian McCarthy
144 building permits since 2011 in Stamford town, CT; Ridgefield town, CT and New Fairfield town, CT, across 5 counties — $1,077,763 in reported job value over 139 permits that state one.
- Building permits
- 144
- Reported job value
- $1.1M
- Active
- 2011–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT50
- Ridgefield town, CT25
- New Fairfield town, CT22
- Brookfield town, CT20
- Redding town, CT8
- New Milford town, CT6
- North Canaan town, CT4
- Darien town, CT2
- New Canaan town, CT2
- Cortlandt town, NY2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2011 | 1 |
| 2014 | 1 |
| 2016 | 4 |
| 2017 | 7 |
| 2018 | 7 |
| 2019 | 8 |
| 2020 | 19 |
| 2021 | 14 |
| 2022 | 13 |
| 2023 | 16 |
| 2024 | 21 |
| 2025 | 13 |
| 2026 (YTD) | 20 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical134
- Generators30
- EV chargers20
- Electric meters17
- HVAC15
- Bathrooms11
- Kitchens10
- Gas9
- Pools & hot tubs8
- Plumbing7
Permit types
As the building departments classify them.
- Electrical Permit96
- Electrical Permit Application16
- Building Permit8
- Electrical (& Portable Generators)7
- Generator Permit Application4
- Electrical Application2
- Fire Alarm System Permit2
- Mechanical Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | GENERATOR | -Trench from service to proposed generator location -Furnish and installation of a 22kw generac generator - Furnish and installation 200 amp rated automatic tra | Bethel Town | $10,000 |
| Oct 27, 2026 | Electrical Permit | Complete electrical installation of the existing Cadenza 40kWh BESS system, including: Install and wire BESS, automatic transfer switch, WattNode meter/CTs, eme | Ridgefield Town | $7,500 |
| Oct 21, 2026 | Electrical Permit | Furnish and install new 200A meter with lever bypass Furnish and install all new service entrance conductors Furnish and install all new grounding and bonding t | Ridgefield Town | $4,000 |
| Oct 20, 2026 | Electrical (& Portable Generators) | Convert existing 200A overhead electrical service to underground service. Furnish and install new underground meter equipment, conduit, and associated wiring. T | Redding Town | $4,985 |
| Oct 19, 2026 | Electrical Permit | Upgrade existing 100A overhead electrical service to 200A. Install new 200A meter main, SEU service entrance cable, 200A 40-circuit main breaker panel, and plyw | Stamford Town | $6,432 |
| Oct 15, 2026 | Building Permit | Furnish and install hot tub on back deck | Brookfield Town | $10,000 |
| Sep 15, 2026 | Generator | Install 10kw Generac guardian generator with ATS | Redding Town | $8,500 |
| Sep 2, 2026 | Electrical Permit | Electrical Permit Scope of Work – Hot Tub Install new dedicated circuit from existing electrical panel to rear deck hot tub. Install properly sized breaker, wir | Brookfield Town | $2,150 |
Permit status
Where its permits stand, as the departments report them.
- Completed81
- Active57
- Stop work ordered4
- Issued2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.